Planning Permission Ireland
RefusedApartmentsDecided 25 November 2020

Greenhills Road, Tallaght, Dublin 24

Demolition of a substation and construction of two apartment buildings in Tallaght.

SD20A/0250 · South Dublin County Council · Lodged 1 October 2020

Reference
SD20A/0250
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
1 October 2020
Residential units
43
Floor area
4104 m²

Summary

AI-generated

The development includes the demolition of an ESB substation and the construction of two buildings. The south building ranges from 5 to 8 storeys containing 28 apartments and 3 commercial units, while the west building ranges from 4 to 5 storeys containing 15 apartments.

Apartmentsapartmentsdemolitionmixed use
Storeys
8

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(i) demolition of existing single storey esb substation (3.5sq. M) on the north western site boundary; (ii) south building ranging from 5 storeys to 8 storeys (max. Height c. 26.40m) with a total gross floor area of 2663sq. M comprising; (a) 28 residential units comprising 17 1-bedroom apartments, 10 2-bedroom apartments and 1 3-bedroom apartment; (b) at ground floor and with frontage onto main road, 3 commercial units to facilitate a range of uses: unit b (73sq. M) - class 1, shop (newsagent, parcel delivery drop store) or class 10 (community centre); unit c (49sq. M) - class 1 shop (cycle store/charity shop); unit d (74sq. M) - class 1, shop, class 2 (financial/professional services) or class 8 (healthcare); (c) also at ground floor, a management office (17sq. M), a maintenance office (12.5sq. M), esb substation and switch room (combined 22sq. M) and commercial bin storage area (12.5sq. M); (iii) west building ranging from 4 storeys to 5 storeys (max. Height c. 16.07m) with a total gross floor area of 1441sq. M comprising (a) 15 residential units including 4 studio units; 5 1-bedroom units, 3 2-bedroom units and 3 3-bedroom units; (b) tenant amenity floorspace (42sq. M) at ground floor;(c) 1 92sq. M commercial unit (cafe/restaurant/deli) at the corner of old greenhills road and main road; (iv) a communal amenity courtyard (459sq. M) and public open space in the form of a new civic plaza (337sq. M) at the corner of old greenhills road and main road and public realm improvements at the southern end of old greenhills road including improvement works to the katherine tynan memorial (505sq. M); (v) a basement (1298sq. M) incorporating 25 residents car parking spaces (including 4 go-car spaces, 2 electric vehicles spaces and 2 accessible spaces), residents long stay cycle parking (50 spaces) and residents waste management facilities (49sq. M); (vi) a new vehicular entrance from the old greenhills road to the proposed basement; (vii) a total of 24 surface level short stay cycle parking spaces comprising 4 spaces at the katherine tynan memorial, 8 spaces within the residents communal courtyard and 12 spaces at the new civic plaza; (viii) removal of 2 on-street car parking spaces on old greenhills road to facilitate access to the proposed basement and installation of a raised pedestrian crossing at the southern end of old greenhills road and (ix) all ancillary site development works including installation of drainage and water supply infrastructure, installation of rooftop solar photovoltaics panels (128sq. M) and lighting.

Land-use zoning

What this land is zoned for

VCUC
To protect, improve and provide for the future development of Village Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Bellvue Apartment, Cookstown, TallaghtOct 2025€195,00045 m
74 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Nov 2025€300,00051 m
76 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Sept 2025€263,00051 m
60 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Feb 2025€336,00075 m
62 New Bancroft Hall, Tallaght, Dublin 24May 2025€336,00075 m
61 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24May 2026€326,00075 m
77 New Bancroft Hall, Tallaghtprice excludes VATFeb 2025€281,00075 m
31 New Bancroft Hall, Greenhills Rd Extension, Tallaght Dublin 24Aug 2025€330,00090 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 October 2020
  2. Decision due25 November 2020
  3. Decision issued25 November 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.