Planning Permission Ireland
GrantedExtensionDecided 18 February 2021

Friarstown Lower, Bohernabreena, Dublin 24

Replacement and raising of a side extension, relocation of the front door, and rebuilding of a shed into a home office.

SD20B/0505 · South Dublin County Council · Lodged 16 December 2020

Reference
SD20B/0505
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
16 December 2020
Floor area
16 m²

Summary

AI-generated

Planning permission is sought for the replacement and raising of a single-storey side extension, relocation of the front door, and window alterations. The project also includes rebuilding a boundary shed into a home office, demolishing an attached shed, and removing a chimney.

Extensionextensionhome officedemolitionrenovation
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Replacement and raising of existing single storey extension roof/walls to side of original house; relocation of front door to opposite/side (south-west) elevation; alterations to window and door opes on all elevations including new windows on side (south-east) elevation; rebuilding of single storey shed structure to west corner of site on boundary and conversion to ancillary home office use with new window/door and existing lane access door omitted; demolition of single storey shed structure attached to house on boundary; works will also include removal of a chimney; provision on a roof light and all associated internal alterations, site, drainage and ancillary works.

Land-use zoning

What this land is zoned for

HA-DMHA
To protect and enhance the outstanding natural character of the Dublin Mountains Area

National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 4 September 2019.

Notified floor area: 118.2

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Friarstown, Bohernabreena, DublinJun 2026€500,000107 m
Mountpelier, Bohernabreena, TallaghtSept 2025€581,000493 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 December 2020
  2. Decision due18 February 2021
  3. Decision issued18 February 2021
  4. Grant issued29 March 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.