Planning Permission Ireland
GrantedApartmentsDecided 29 September 2021

The Little John Centre, 122 - 122A, Cromwellsfort Road, Dublin 12

Demolition of rear structures and construction of a three to four storey building with 20 apartments for older people.

SD21A/0135 · South Dublin County Council · Lodged 2 September 2021

Reference
SD21A/0135
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
2 September 2021
Residential units
20
Floor area
1611 m²

Summary

AI-generated

The development at the Little John Centre involves the demolition of existing rear structures. In its place, a three to four storey building will be constructed to provide 20 one-bedroom apartments designated as Housing for Older People, complete with balconies, 8 car parking spaces, and 20 bicycle spaces.

Apartmentssenior livingapartmentsdemolition
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition to the rear of little john centre; construction of a three to four storey development (on an overall site of 0.14ha) comprising 20 one bedroom housing for older people apartments (each with balcony/terrace); 1 vehicular access point via cherry grove; 8 car parking spaces; 20 bicycle parking spaces; bin storage; an esb substation and all boundary treatment, site services, landscaping and site development.

Land-use zoning

What this land is zoned for

LCDC
To protect, improve and provide for the future development of Local Centres

National zoning type: District, neighbourhood centre

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 1 September 2023. A completion certificate was lodged on 4 September 2024.

Notified floor area: 1,454.66

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
138 Cromwellsfort Road, Walkinstown, Dublin 12Aug 2025€639,00085 m
13 Moeran Rd, Walkinstown, Dublin 12Sept 2025€425,000110 m
94 Beechfield Rd, Walkinstown, Dublin 12Oct 2025€610,000124 m
66 Obrien Rd, Walkinstown, Dublin 12Feb 2025€602,000152 m
1 Beechfield Close, Walkinstown, Dublin 12Oct 2025€620,000154 m
103 Cromwells Fort Rd, Walkinstown, Dublin 12Nov 2025€750,000165 m
181 Cherryfield Rd, Walkinstown, Dublin 12Mar 2026€537,000195 m
20 Cherryfield Ave, Walkinstown, Dublin 12May 2025€480,000195 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 September 2021
  2. Further information requested19 July 2021
  3. Further information received2 September 2021
  4. Decision due29 September 2021
  5. Decision issued29 September 2021
  6. Appeal submitted26 October 2021
  7. Appeal decided27 April 2022
  8. Permission expiry3 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.