Planning Permission Ireland
GrantedIndustrialDecided 30 November 2021

Block R, Jordanstown Road, Aerodrome Buisness Park, Rathcoole, Co. Dublin

Construction of a large warehouse with offices and parking in Rathcoole.

SD21A/0140 · South Dublin County Council · Lodged 3 November 2021

Reference
SD21A/0140
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
3 November 2021
Floor area
22966 m²

Summary

AI-generated

Permission is sought for a massive 22,966 sqm warehouse reaching up to 16 meters in height. The development includes ancillary offices, 210 car parking spaces, HGV yards, and a new vehicular access road.

Industrialwarehouselogisticscommercial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of 1 warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 16 meters with a gross floor area of 22,966sq. M including a warehouse area (21,113sq. M), ancillary office areas (1,163sq. M) and staff facilities (690sq. M); the provision of a new vehicular access to the site from jordanstown road including 2 additional access gates from this new road to the existing site e to the north; pedestrian access; 210 ancillary car parking spaces; bicycle parking; hgv yards; level access goods doors; dock levellers; access gates; hard and soft landscaping; lighting; boundary treatments; esb substation; plant; extinguishment of the existing vehicular access (farm gate) in lieu of a proposed pedestrian access gate at the southern portion of the site from the r120; and all associated development works above and below ground; all on a site of 5.67 on lands that are bounded to the west by blocks a - d jordanstown road, to the south and east by greenfield lands and to the north by greenfield lands and block e. The site abuts the r120 newcastle village to rathcoole road to the south.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 February 2022. A completion certificate was lodged on 29 September 2023.

Notified floor area: 32

3 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 November 2021
  2. Further information requested22 July 2021
  3. Further information received3 November 2021
  4. Decision due30 November 2021
  5. Decision issued30 November 2021
  6. Grant issued21 January 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.