Planning Permission Ireland
GrantedEnergyDecided 7 November 2022

Citywest Shopping Centre, Fortunestown, Dublin 24

Amendments to a permitted housing development to add solar panels and roof plant.

SD22A/0299 · South Dublin County Council · Lodged 11 October 2022

Reference
SD22A/0299
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
11 October 2022
Floor area
195.7 m²

Summary

AI-generated

Proposed amendments to a permitted Strategic Housing Development. The changes include installing photovoltaic panels on 6 blocks, adding roof plant, providing an ESB substation, and reconfiguring ground floor plant rooms.

Energysolarsubstationshdapartments

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of amendments to the strategic housing development permitted under an bord pleanála reference ta065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. Blocks, the provision of roof plant at blocks a, b, c and d, the provision of an esb substation at block o that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of block e to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of esb to serve the site. At block a it is proposed to provide the following: 21 no. Photovoltaic panels arranged in 3 no. Rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At block b it is proposed to provide the following: 21 no. Photovoltaic panels arranged in 3 no. Rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At block c it is proposed to provide the following: 21 no. Photovoltaic panels arranged in 3 no. Rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At block d it is proposed to provide the following: 21 no. Photovoltaic panels arranged in 3 no. Rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick esb substation with lv switch room to the southwest of the block d, and the ancillary relocation of 1 no. Car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At block e it is proposed to provide the following; 18 no. Photovoltaic panels arranged in 3 no. Rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged plant room (117.15 sqm}, esb substation (13.6 sqm), a generator room (21.82 sqm}, and a low voltage (l v} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At block f it is proposed to provide 18 no. Photovoltaic panels arranged in 2 no. Rows. These, and all associated site works including landscaping at a site of 2.9 hectares.

Land-use zoning

What this land is zoned for

DCDC
To protect, improve and provide for the future development of District Centres

National zoning type: District, neighbourhood centre

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
315 Citywest Plaza, Citywest, Dublin 24Feb 2026€326,00021 m
309 Citywest Plaza, Citywest, Dublin 24Jan 2026€250,00031 m
307 Citywest Plaza, Citywest, Dublin 24Sept 2025€235,00031 m
60 Fortunes Lawn, Fortunestown Lane, Citywest Dublin 24Jul 2025€305,00055 m
Apt 14 Block B1, Fortunes Lawn, City West DublinJul 2025€270,00055 m
15 Fortunes Lawn, City Park, Citywest Dublin 24Apr 2025€290,00055 m
71 Fortunes Lawn, City Park, CitywestAug 2025€325,00068 m
23 Fortones Lawn, Citypark, CitywestFeb 2026€300,00068 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 October 2022
  2. Further information requested29 August 2022
  3. Further information received11 October 2022
  4. Decision due7 November 2022
  5. Decision issued7 November 2022
  6. Grant issued15 December 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.