Planning Permission Ireland
RefusedNew dwellingDecided 2 November 2022

Beechlawn, Kilakee Road, Rathfarnham, Dublin 16

Demolition of an extension and construction of a new two-storey house with wastewater treatment systems.

SD22A/0354 · South Dublin County Council · Lodged 8 September 2022

Reference
SD22A/0354
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
8 September 2022
Floor area
297.5 m²

Summary

AI-generated

The development involves the demolition of an existing bedroom extension and the construction of a new contemporary two-storey house on family lands. It includes installing two new sewerage treatment plants, a new well, and landscaping works.

New dwellingdemolitionruralwastewater
Residential unit
1
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of a bedroom extension to the existing house, previously granted under ref. Sd05b/0144; construction of a new two storey house, on family lands, beside beechlawn; the proposed contemporary house follows the existing contours of the slope; external works include the removal of sections of existing hedging, the existing septic tank (which currently serves beechlawn), the planting of new native species mix hedges and low fencing; the installation of two new sewerage treatment plants and associated percolation areas to serve the existing and proposed houses, provision of a soak away for surface water; a new well to supply water to the proposed house, parking for two cars, an electric car charging point and landscaped stepped terraces and associated external works; the proposed house is to be accessed via a right of way from the existing lane and through the grounds of beechlawn.

Land-use zoning

What this land is zoned for

RURU
To protect and improve rural amenity and to provide for the development of agriculture

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received8 September 2022
  2. Decision due2 November 2022
  3. Decision issued2 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.