Planning Permission Ireland
GrantedAlterationsDecided 12 October 2022

76, Dodder Park Road, Rathfarnham, Dublin 14

Retention of changes to a previously approved scheme and permission for a revised canopy roof.

SD22B/0369 · South Dublin County Council · Lodged 18 August 2022

Reference
SD22B/0369
Authority
South Dublin County Council
Register status
Decided
Type
Permission and Retention
Received
18 August 2022
Floor area
130.4 m²

Summary

AI-generated

This application seeks retention for omissions and changes made to a previously approved development, including omitting a first-floor extension and garage extension. It also seeks permission for a revised, reduced-length canopy roof at the front.

Alterationsretentioncanopysolar panels

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission sought for revised canopy roof and retention of omissions and changes made to previously approved application ref: sd19b/0196 to existing 2 storey dwelling; works which include omission of (i) first floor extension and main roof extended over at side and front of existing dwelling (ii) extension to garage on front elevation (iii) bay window to sitting room. (vi) rooflight to main roof all on north elevation; in addition to changes which include (v) rendered finish to extension in place of timber cladding and photo voltaic panels on main roof all on south elevation at rear, in addition to minor internal and external alterations/ additions and associated site works along with permission sought for reduction in length of canopy roof (at front ) on north elevation.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 September 2019.

Notified floor area: 72

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
76 Dodder Park Rd, Rathfarnham, Dublin 14Oct 2025€1,160,0004 m
78 Dodder Park Rd, Rathfarnham, Dublin 14Jul 2025€950,00010 m
89 Dodder Park Road, Rathfarnham, Dublin 14Jul 2025€755,00056 m
97 Dodder Park Road, Rathfarnham, Dublin 14Mar 2026€905,00060 m
Apt 24, Riverbank, Dodder Park RdJun 2025€318,00092 m
75 Ballytore Rd, Rathfarnham, Dublin 14Dec 2025€999,99993 m
93 Ballytore Rd, Rathfarnham, Dublin 14Jul 2025€835,00098 m
61 Lower Dodder Rd, Rathfarnham, Dublin 14Mar 2025€828,50098 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 August 2022
  2. Decision due12 October 2022
  3. Decision issued12 October 2022
  4. Grant issued22 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.