Planning Permission Ireland
GrantedRetentionDecided 10 May 2023

A1, Baldonnell Business Park, Baldonnell, Dublin 22

Retention of a relocated and resized workshop, well pumphouse, and water tank in Baldonnell.

SD23A/0054 · South Dublin County Council · Lodged 16 March 2023

Reference
SD23A/0054
Authority
South Dublin County Council
Register status
Decided
Type
Retention
Received
16 March 2023

Summary

AI-generated

Retention permission is sought for a relocated and resized 186 sqm workshop, a relocated pedestrian gate, and a relocated HGV wash area. The application also includes a new well pumphouse, an above-ground water tank, and gabion retaining walls.

Retentionindustrialretentionworkshopinfrastructure
Floor area
186 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Relocation and resizing of previously granted ancillary workshop within the facility towards the south-east, now measuring 186sq. M overall height 7.2m (previously granted at 300sq. M and 9.7m high); relocation of pedestrian entrance gate by 9m on the northern site boundary due to design change to accommodate site levels and access gradients; relocated hgv wash area adjacent to repositioned workshop building and associated drainage adjustments due to relocating the workshop and hgv wash bay; 1m high gabion retaining walls to the site's southern boundary (rear) to facilitate level differences between the subject site and the neighbouring site; provision of an on-site well pumphouse (4.8sq. M and 2.7m high); provision of associated above ground water tank (10m x 3m x 3m, 90m3); the overall site area remains as per the previous application at 0.98ha and there is no alteration to site landscaping.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received16 March 2023
  2. Decision due10 May 2023
  3. Decision issued10 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.