Planning Permission Ireland
GrantedIndustrialDecided 11 January 2024

Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12

Construction of three light industrial and wholesale units at Ballymount Industrial Estate.

SD23A/0179 · South Dublin County Council · Lodged 18 December 2023

Reference
SD23A/0179
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
18 December 2023

Summary

AI-generated

The development consists of building three enterprise, light industrial, and wholesale units (Units A, B, and C) with ancillary offices over two levels, totaling 1,576 sq.m. The project includes 25 car parking spaces, 20 cycle spaces, a substation, PV panels, and associated site works as an extension to a previously permitted scheme.

Industrialindustrialofficesubstation
Storeys
2
Floor area
1,576 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of 3 no. Enterprise / light industrial / wholesale outlet units (units a, b and c), including ancillary office / administration areas over two levels, with a total gfa of 1,576 sq. M. The proposal includes 25 no. Car parking spaces (which includes 2 no. Van parking spaces), 20 no. Cycle spaces, a unit substation, signage zones for the units delivery / loading areas, landscaping, boundary treatments, lighting, pv panels, foul and surface water drainage and all associated development. The proposal forms an extension to the development permitted under reg. Ref. : sd22a/0099 and includes vehicular and pedestrian access off the permitted internal access road to the immediate south of the proposed units. The application site is located to the north west of, and will be accessed from, the development permitted under reg. Ref. : sd22a/0099 (to be known as apex hub), and is located to the southeast of crosslands business park, ballymount road lower.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 September 2023.

Notified floor area: 3,140

4 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 December 2023
  2. Decision due15 January 2024
  3. Decision issued11 January 2024
  4. Permission expiry19 February 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.