Planning Permission Ireland
WithdrawnExtensionDecided 25 July 2023

Ballymaice House, Ballymaice, Bohernabreena, D24 TV70

Single-storey extension and conversion of a stone garage to habitable space in Bohernabreena.

SD23B/0307 · South Dublin County Council · Lodged 14 July 2023

Reference
SD23B/0307
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
14 July 2023
Floor area
62.2 m²

Summary

AI-generated

Permission is sought for a 62.2 sqm single-storey side extension to an existing bungalow, internal reconfiguration, and the conversion of a vacant two-storey stone garage into habitable space connected to the main dwelling.

Extensionextensionconversiongaragestone building
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Single storey side extension (62.2sq. M) to the existing main bungalow. Reconfiguring the current internal layout of the bungalow, adding one extra bedroom with a total of three. It consists of relocating the main entrance door to the front (west) elevation and changing the original entrance to fenestration. The conversion and extension of the vacant 2 storey stone garage/storage (to the northwest side) with minor external amendments to convert it to a habitable space, including repaired ladder, new windows and doors, connecting both the new extension (62.2sq. M) and the existing bungalow. The addition of new exterior finishes, including stone and wood, to the existing bungalow and wooden gates to the outbuilding. All with associated site work, permeable paving & paths, vehicular access and parking.

Land-use zoning

What this land is zoned for

HA-DMHA
To protect and enhance the outstanding natural character of the Dublin Mountains Area

National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received14 July 2023
  2. Decision due7 September 2023
  3. Decision issued25 July 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.