Planning Permission Ireland
GrantedExtensionDecided 7 May 2024

4A, Forest Avenue, Tallaght, Dublin 24

Demolition of a rear extension and construction of new front, rear, and first-floor extensions in Tallaght.

SD23B/0502 · South Dublin County Council · Lodged 15 April 2024

Reference
SD23B/0502
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
15 April 2024

Summary

AI-generated

The project involves the demolition of an existing single-storey rear extension. It proposes new single-storey front and rear extensions, a first-floor rear extension, a rear dormer window, and modifications to the front boundary and vehicular access.

Extensionextensiondemolitiondormerrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Demolition of existing single storey rear extension. Construction of new single storey flat roofed extension to consist of a kitchen, lounge & utility room. Construction of a new ground floor single story flat roof extension of the front of existing dwelling to consist of porch and extended living room. Construction of a new rear first floor flat roof extension to consist of a bedroom. Construction of a new flat roof rear facing dormer window to attic room for use as a home office/study. Genera; remodel and upgrade of the main dwelling to suit the proposed layouts. Modification to existing front boundary treatment and vehicular access including a new front boundary treatment and vehicular access onto forest avenue kingswood tallaght dublin
  • All drainage, structural and associated site works to be implemented

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 May 2025.

Notified floor area: 159

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 Forest Close, Kingswood, Dublin 24Dec 2025€608,00048 m
13 Forest Ave, Kingswood, Dublin 24Nov 2025€426,00075 m
78 Walnut Close, Kingswood, Dublin 24Jul 2025€336,00087 m
64b Walnut Close, Kingswood, Dublin 24Dec 2025€465,00094 m
22 Forest Close, Kingswood Heights, Tallaght Dublin 24Apr 2025€600,000111 m
12 Forest Park, Kingswood Heights, TallaghtJun 2025€392,000123 m
8 Forest Lawns, Kingswood Heights, Clondalkin Dublin 24Jul 2025€475,000150 m
18 Forest Park, Kingswood Heights, Tallaght Dublin 24May 2026€405,000151 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 April 2024
  2. Decision due12 May 2024
  3. Decision issued7 May 2024
  4. Permission expiry17 June 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.