Planning Permission Ireland
GrantedExtensionDecided 4 March 2024

8, Castle Riada Grove, Lucan, Co. Dublin, K78 EK77

A two-storey side extension and boundary wall extension at a house in Lucan.

SD24B/0010 · South Dublin County Council · Lodged 12 January 2024

Reference
SD24B/0010
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
12 January 2024

Summary

AI-generated

The development consists of a two-storey pitched roof extension to the side of a single-family dwelling, extending the main roof ridge to form a gable. It also includes extending the rear boundary wall along the public footpath and making internal and external alterations.

Extensionextensionsuburbanalterations
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a two storey pitched roof extension to the side of the single family dwelling (including the extension to the main existing roof ridge to form a gable) and the extension of the north facing boundary wall to the rear of the public footpath along castle road. The development will include changes to the elevations of the property and will include internal alterations for all uses associated with the domestic use of the single family dwelling

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 March 2025.

Notified floor area: 145

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
61 Castleriada Grove, Lucan, DublinAug 2025€353,000117 m
72 Castleriada Grove, Lucan, DublinSept 2025€406,000130 m
38 Fforster Lawn, Ballydowd Manor, LucanJul 2025€466,000132 m
53 Castleriada Grove, Lucan, DublinJan 2026€461,000132 m
57 Fforster Lawn, Ballydowd Manor, LucanAug 2025€491,000141 m
27 Fforster Court, Lucan, DublinAug 2025€507,000145 m
44 Fforster Lawn, Lucan, DublinMay 2025€348,000147 m
63 Fforster Lawn, Ballydowd Manor, LucanJul 2025€469,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 January 2024
  2. Decision due7 March 2024
  3. Decision issued4 March 2024
  4. Permission expiry15 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.