Planning Permission Ireland
GrantedRetentionDecided 1 April 2025

Weston Airport, Backwestonpark, Leixlip, Dublin, W23XHF8

Retention of minor alterations to the terminal building at Weston Airport.

SD25A/0024W · South Dublin County Council · Lodged 6 February 2025

Reference
SD25A/0024W
Authority
South Dublin County Council
Register status
Decided
Type
Retention
Received
6 February 2025

Summary

AI-generated

Retention is sought for minor alterations to a previous permission at the terminal building, including revised fire escape doors, relocated stairs, and updated signage. The application also proposes omitting previously planned second-floor offices.

Retentionairportretentionsignage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention of minor alterations to the existing grant of permission sd22a/0345 comprising; revised arrangement of fire escape door and window, at stair core no. 2, replacement of freestanding metal lettering with self-illuminated lettering for the "weston airport" sign on the front canopy, and the termination of the overhanging canopy at western side of new foyer, all on the northwestern side of the terminal. The alteration and relocation of escape stairs 3, by 2.78 m to the southeast, on the southwestern side of the terminal. The omission of the customs office, and changes to the arrivals and departures lobbies and the replacement of freestanding metal lettering signage with 2 no. Backlit wall mounted signs (flags) on the southeastern side of the terminal. Also applied for are alterations to previous grant of permission consisting of the omission of the proposed second-floor offices, and the omission of new openings in parapet walls at second floor level facing the runway.

Land-use zoning

What this land is zoned for

RURU
To protect and improve rural amenity and to provide for the development of agriculture

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received6 February 2025
  2. Decision due2 April 2025
  3. Decision issued1 April 2025
  4. Permission expiry15 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.