Planning Permission Ireland
GrantedExtensionDecided 1 May 2025

28, Fernhill Road, Manor Estate, Terenure, Dublin 12

Demolition of a side extension to build a new part single-storey, part two-storey extension and a garden studio in Terenure.

SD25B/0132W · South Dublin County Council · Lodged 12 March 2025

Reference
SD25B/0132W
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
12 March 2025

Summary

AI-generated

The project involves demolishing an existing side extension to construct a part single-storey and part two-storey extension to the rear and side. It also includes internal alterations, a new garden studio for a home office, gym, and bathroom, and changes to the vehicular entrance.

Extensionextensiondemolitiongarden studio

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of the demolition of the existing side extension, internal alterations to existing ground and first floor levels, the construction of a part single-storey and part two-storey extension to the rear and side of the existing dwelling, alterations to the existing materiality and fenestration details to the existing dwelling, the construction of a new garden studio to accommodate a home office, gym and bathroom, along with alterations to the existing vehicular entrance, all along with associated landscaping, ancillary and site works.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 31 July 2025.

Notified floor area: 186.9

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 Fernhill Rd, Manor Estate, Terenure Dublin 12Mar 2026€810,00069 m
44 Fernhill Rd, The Manor, Terenure Dublin 12Dec 2025€672,00071 m
11 Fernhill Road, Manor Estate, TerenureNov 2025€750,50085 m
37 Fernhill Rd, Manor Estate, Dublin 12Nov 2025€700,000106 m
39 Fernhill Rd, Manor Estate, Dublin 12May 2026€615,000114 m
35 Temple Manor Way, Walkinstown, Dublin 12May 2025€575,000158 m
36 Fernhill Park, Terenure, Dublin 12Jun 2026€665,000163 m
33 Temple Manor Way, Walkinstown, Dublin 12Sept 2025€520,000163 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 March 2025
  2. Decision due6 May 2025
  3. Decision issued1 May 2025
  4. Permission expiry10 June 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.