Planning Permission Ireland
GrantedAlterationsDecided 9 July 2025

154, Templeville Dr, Templeogue, Dublin 6W, D6W VE28

Revisions to a previously approved extension in Templeogue, including reducing the extension size and changing the roof design.

SD25B/0288W · South Dublin County Council · Lodged 22 May 2025

Reference
SD25B/0288W
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
22 May 2025

Summary

AI-generated

The application seeks revisions to a previously approved permission. Changes include reducing the front/side single-storey extension, omitting a first-floor rear extension, changing the rear extension roof from pitched to flat, and applying external wall insulation to the entire house.

Alterationsrenovationinsulation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Revisions to previously approved grant of permission reg. Ref. Sd24b/0317w consisting of the reduction / part omission of the approved single storey extension to the front / side with two new windows at ground floor to the side now proposed in lieu; the omission of the approved first floor rear extension; the omission of 1no. Approved skylight to the side hipped main roof; and a change of design to the roof of the approved rear single storey extension from pitched / sloped to flat with parapet; works will also include minor alterations to window / door openings at ground floor to rear, to window at first floor to rear and application of external wall insulation to all elevations of the existing house;

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 February 2025.

Notified floor area: 217.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
37 Cypress Grove Rd, Templeogue, Dublin 6wJan 2026€735,00085 m
11 Templeville Dr, Templeogue, Dublin 6wMar 2025€820,00098 m
128 Templeville Dr, Templeogue, Dublin 6wJun 2025€806,000123 m
23 Cypress Grove Rd, Templeogue, Dublin 6wFeb 2025€935,000124 m
Monesi, 8 Templeville Ave, Templeogue Dublin 6wAug 2025€1,046,000174 m
33 Templeville Drive, Templeogue, Dublin 6wNov 2025€915,000194 m
118 Templeville Dr, Templeogue, Dublin 6wJan 2026€770,000202 m
68 Templeville Road, Templeogue, Dublin 6wApr 2026€870,000209 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 May 2025
  2. Decision due16 July 2025
  3. Decision issued9 July 2025
  4. Permission expiry19 August 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.