Planning Permission Ireland
Awaiting decisionInfrastructureDecision due today (23 July 2026)

Luas Project Office, Red Cow Luas Depot, Naas Road, Dublin 22, D22 C5P3

Extension of the Red Cow Luas Depot to add maintenance lanes, a first-floor control room, solar panels, and a new substation.

SD26A/0127W · South Dublin County Council · Lodged 12 June 2025

Reference
SD26A/0127W
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
12 June 2025

Summary

AI-generated

The development consists of extending the existing depot to provide two new maintenance lanes and extending two existing lanes at lower ground level. It also includes a first-floor extension for a Central Control Room, solar panels on the roof, and a new ESB substation.

Infrastructureluassolarsubstationtransit
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • An extension to the existing depot to provide two new luas maintenance lanes (nos. 7 and
  • At lower ground floor level
  • Extension of existing maintenance lanes 3 and 4 at lower ground floor level
  • A first-floor extension to accommodate a central control room (ccr), including associated escape stairs and lift
  • Installation of solar panels on both the new and existing roof areas
  • Provision of a new esb substation
  • All associated site development and ancillary works

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
94 Highgrove Apartments, Mount Talbot, Monastery RoadNov 2025€340,000367 m
111 Mount Talbot, Monastery Rd, Clondalkin Dublin 22May 2026€280,000367 m
76 Mount Talbot, Monastery Rd, Clondalkin Dublin 22Feb 2026€311,000385 m
77highgrove, Mount Talbot, Monastery RdMar 2026€300,000385 m
43 Hillview, Mount Talbot, Clondalkin Dublin 22Jun 2026€308,000394 m
16 Hillview, Mount Talbot, ClondalkinJun 2025€250,000394 m
24 Hillview, Mount Talbot, ClondalkinJul 2025€315,000394 m
Apt.3 - Hillview, Mount Talbot, ClondalkinApr 2026€275,000394 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 June 2025
  2. Decision due23 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.