Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
Demolition of an industrial building to construct 196 build-to-rent apartments in four blocks up to nine storeys tall.
SHD3ABP-303803-19 · South Dublin County Council · Lodged 20 February 2019
- Reference
- SHD3ABP-303803-19
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- SHD3-Application to ABP
- Received
- 20 February 2019
- Residential units
- 196
Summary
AI-generatedThis strategic housing development involves demolishing a 2,590 sq.m industrial building. In its place, 196 build-to-rent apartments will be built across four blocks ranging from six to nine storeys, alongside a commercial unit, office, crèche, gym, and basement parking.
- Storeys
- 9
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Demolition of the existing 2,590sq. M industrial building and the construction of a 'build to rent' housing development providing a total of 196 residential apartments (comprising 45 studio units, 48 one-bed units, 8 two-bed (3-person) units and 95 two-bed (4-person) units) in 4 six-nine storey blocks over basement. The development will include 1 commercial unit (248sq. M, accommodating class 1, 2 and 8 uses as per the planning and development regulations, 2001-2018) at ground floor level, 1 office unit (111sq. M) at ground floor level; a crèche(192sq. M) at ground floor level; a gym (18sq. M) at ground floor level; 6 communal amenity spaces provided at ground and first floor levels across the development (totalling 286sq. M); a communal hot desk room (25sq. M) at ground floor level; and 3 communal secure storage areas (totalling 31sq. M) at ground floor level; along with a ground floor level landscaped courtyard, 408 bicycle spaces (308 resident spaces at basement level and 100 visitor spaces at ground floor level); an underground carpark (accessed from second avenue, providing a total of 67 parking spaces (including 61 standard spaces and 6 mobility impaired user parking spaces)) and refuse/waste/recycling stores. Associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; esb substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. The breakdown of units is as detailed below: block a (located in the north-eastern corner of the site) comprises a total of 43 units, as follows: (a) 10 studio apartments, (b) 13 1-bed apartments and (c) 20 2-bed (4-person) apartments. Block b (located in the north-western corner of the site) comprises a total of 50 units, as follows: (a) 6 studio apartments, (b) 16 1-bed apartments, (c) 8 2-bed (3-person) apartments and (d) 20 2-bed (4-person) apartments. Block c (located to the west of the site) comprises a total of 50 units, as follows: (a) 15 studio apartments, (b) 6 1-bed apartments and (c) 29 2-bed (4-person) apartments. Block d (located to the south of the site), comprises a total of 53 units, as follows: (a) 14 studio apartments, (b)13 1-bed apartments and (c) 26 2-bed (4-person) apartments. Each unit in block a, b, c & d has associated private open space in the form of a ground floor terrace or a balcony. Additional discussions regarding the proposed development are provided in the architectural drawings, prepared by c+w o'brien architects, and the statement of consistency & planning report, prepared by hughes planning and development consultants, submitted with the application.
Land-use zoning
What this land is zoned for
“To facilitate enterprise and/or residential led regeneration”
National zoning type: Mixed Use, general development, opportunity/proposal site
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 58 Birchwood Heights, Springfield, Tallaghtnot full market price | Jul 2025 | €315,000 | 218 m |
| 20 Cairnwood Court, Cookstown, Tallaght Dublin 24 | Mar 2026 | €380,000 | 229 m |
| 8 Ambervale, Cookstown, Dublin 24 | Apr 2025 | €417,000 | 231 m |
| 22 Cairnwood Avenue, Cookstown, Tallaght | Dec 2025 | €360,000 | 235 m |
| 20 Cairnwood Avenue, Cookstown, Tallaghtnot full market price | May 2025 | €345,000 | 240 m |
| 31 Cairnwood Court, Springfield, Dublin 24 | Mar 2025 | €361,000 | 263 m |
| 7 The Magnolia, Silvervale, Cookstown Roadprice excludes VAT | Dec 2025 | €1,136,564 | 276 m |
| 14 The Wisteria, Silver Vale, Cookstown Roadprice excludes VAT | Dec 2025 | €850,220 | 276 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received20 February 2019
- Decision due16 April 2019
- Decision issued25 July 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- RefusedAt this site
Amendments to ABP Ref. No. ABP-303803-19 requested pursuant to Section 146B of the Planning and Development…
Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
ABP-311555-21South DublinLodged 22 Feb 2022Apartments
- GrantedAt this site
Change of use of existing factory/warehouse to a parking facility, with spaces for 150 vehicles, 1 no.…
Cookstown Way & Cookstown Industrial Estate, Tallaght, Dublin 24
SD04A/0760South DublinLodged 7 Feb 2005Change of use
- RefusedAt this site
Mixed residential and commercial development (total GFA of 25,439.03sq.m) providing a total of 184 apartments…
Unit, 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
SD16A/0267South DublinLodged 27 Jul 2016Apartments
- GrantedAt this site
The development consists of; (i) retention permission for amendments to the previously approved development…
Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
LRD23A/0006South DublinLodged 13 Jul 2023Retention
- GrantedAt this site
Mixed residential and commercial development (total GFA of 19564.2sq.m) providing a total of 126 apartments…
Unit, 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
SD17A/0212South DublinLodged 19 Jan 2018Apartments
- GrantedAt this site
An amendment to the permitted commercial retail unit 2 at Blocks B/C as granted under ABP. Ref. 303803-19 and…
Commercial Retail Unit 2, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24, D24 Y447
LRD24A/0002South DublinLodged 19 Mar 2024Commercial
- Granted80 m away
(a) Planning permission is sought for: (i) the construction of a residential development comprising a total…
Site of the former, Cookstown House, Cookstown Way, Tallaght, Dublin 24.
SD23A/0237South DublinLodged 26 Apr 2024Apartments
- Granted80 m away
We, KAVCO C TOWN PROJECT LIMITED, intend to apply for planning permission for the proposed development at the…
Cookstown House, Cookstown Way, Tallaght, Dublin 24.
SD25A/0207WSouth DublinLodged 29 Aug 2025Apartments
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedApartments
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a…
Glen Abbey Complex, Belgard Road, Cookstown Industrial Estate, Dublin 24, D24 W2XA
SHD3ABP-309916-21/EPSouth DublinLodged 29 Sept 2025
- GrantedApartments
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments…
Units 66 & 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
SHD3ABP-308398-20/EPSouth DublinLodged 3 Oct 2025
- GrantedApartments
Mixed residential and commercial development (total GFA of 19564.2sq.m) providing a total of 126 apartments…
Unit, 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
SD17A/0212South DublinLodged 19 Jan 2018
- Awaiting decisionApartments
The development will consist of the demolition of the existing two storey dwelling and the construction of a…
Aylesbury House , Main Street Portan , Clonee Co. Meath
RA191553MeathLodged 21 Nov 2019
- RefusedApartments
Mixed residential and commercial development (total GFA of 25,439.03sq.m) providing a total of 184 apartments…
Unit, 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
SD16A/0267South DublinLodged 27 Jul 2016
- InvalidApartments
The development will consist of a 74 unit Build-to-Rent scheme consisting of 11 no. 2-bedroom apartments, 18…
Site of 0.17 hectares at Turnpike Lane, at the rear of No. 59-69, Drumcondra Road Lower, Dublin 9
3399/22Dublin CityLodged 1 Mar 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.