Rosegreen Road, Fethard, Co. Tipperary
Construction of a new dwelling, driveway entrance, and domestic foul pumping station in Fethard.
201111 · Tipperary County Council · Lodged 30 September 2020
- Reference
- 201111
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 30 September 2020
- Residential units
- 1
- Floor area
- 224 m²
Summary
AI-generatedThe development consists of the construction of a new dwelling house and a driveway entrance. It also includes a domestic foul pumping station and rising main to connect to the existing foul sewer.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Construction of a dwelling, driveway entrance, domestic foul pumping station, rising main including connection to existing foul sewer, and all associated site development works
Land-use zoning
What this land is zoned for
“To preserve and enhance existing residential amenity including provision of additional facilities for settlements where gaps are identified in the DIA”
Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 19 An Seanline, Fethard, Co. Tipperaryprice excludes VAT | Jul 2025 | €237,800 | 196 m |
| The Valley, Fethard, Clonmel | May 2026 | €361,000 | 427 m |
| 1 Monroe, Fethard, Tipperary | May 2026 | €315,000 | 463 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received30 September 2020
- Further information requested23 November 2020
- Further information received2 February 2021
- Decision due1 March 2021
- Decision issued26 February 2021
- Grant issued1 April 2021
- Permission expiry31 March 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A change of house type from that previously granted under reference no. 201111 including all associated site…
Rosegreen Road , Fethard , Co. Tipperary
21673TipperaryLodged 14 May 2021Alterations
- Granted60 m away
To change the design of the proposed dwelling and footprint of the proposed dwelling within the site as…
Rosegreen Road , Fethard , Co Tipperary
2360332TipperaryLodged 18 May 2023Alterations
- Granted60 m away
Development will consist of a two storey 5 bedroom house and garden shed. The development will include new…
Rosegreen Road , Fethard , Co. Tipperary
211665TipperaryLodged 17 Nov 2021New dwelling
- Awaiting decision80 m away
Development will consist of a two storey 5 bedroom house and garden shed. The development will include new…
Rosegreen Road , Fethard , Co. Tipperary
211537TipperaryLodged 19 Oct 2021New dwelling
- Granted180 m away
Construction of 22 no. residential units consisting of 10 no. semi-detached 3 bedroom units, 8 no.…
An Seanline , Fethard , Co. Tipperary
21926TipperaryLodged 24 Jun 2021Housing estate
- Granted260 m away
Construction of front lobby to the existing shop and for retention of the solar panels on the roof and…
Daybreak Shop and Filling Station , Kerry Street , Fethard Co Tipperary
2660350TipperaryLodged 23 Apr 2026Commercial
- Awaiting decision330 m away
Demolition to rear of dwelling, construction of a two-storey extension to rear of existing dwelling,…
Kerry Street , Fethard , Co. Tipperary
2461059TipperaryLodged 7 Dec 2024Extension
- Awaiting decision330 m away
The demolition of an existing kitchen, bathroom, bedroom and roof located at the rear of dwelling and the…
Kerry Street , Fethard , Co.Tipperary
2461129TipperaryLodged 19 Dec 2024Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedNew dwelling
The construction of a new dwelling house, connection to public foul sewer, site entrance, driveway and all…
Kilduff , Pallasgreen , Co. Limerick.
18322LimerickLodged 5 Apr 2018
- GrantedNew dwelling
Construction of a new dwelling; new connection to the existing public foul sewer, new road entrance and all…
Hillquarter , Coosan , Athlone
197202WestmeathLodged 1 Oct 2019
- GrantedNew dwelling
To construct an entrance, dwelling house, domestic garage, together with all associated site works, foul…
Shanaway Rd , Ennis , Co Clare
21787ClareLodged 27 Jul 2021
- GrantedNew dwelling
Construction of a new dwelling house with pumped connection to existing foul sewer and all other ancillary…
Blackgardens , Killarga , Co. Leitrim
19248LeitrimLodged 21 Nov 2019
- GrantedNew dwelling
The construction of a dwelling house, connection to foul sewer, upgrade existing vehicular entrance,…
Carraward East , Dromcollogher , Co. Limerick
23597LimerickLodged 12 Dec 2023
- WithdrawnNew dwelling
Construction of a dwellinghouse and waste water pump sump and rising main to connect to existing public…
Reenmeen East, Glengarriff, Co. Cork
25/6205corkLodged 16 Oct 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.