Rosegreen Road, Fethard, Co. Tipperary
Construction of a new two-storey five-bedroom house and garden shed in Fethard.
211665 · Tipperary County Council · Lodged 17 November 2021
- Reference
- 211665
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 17 November 2021
- Residential units
- 1
- Floor area
- 235 m²
Summary
AI-generatedThe project involves building a new two-storey, five-bedroom house and a garden shed. It includes a new entrance driveway, connection to the existing foul sewer, external landscaping, and minor works.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development will consist of a two storey 5 bedroom house and garden shed. The development will include new entrance driveway, foul pipe including connection to existing foul sewer, external landscaping and sundry other minor works
Land-use zoning
What this land is zoned for
“To preserve and enhance existing residential amenity including provision of additional facilities for settlements where gaps are identified in the DIA”
Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 19 An Seanline, Fethard, Co. Tipperaryprice excludes VAT | Jul 2025 | €237,800 | 145 m |
| The Valley, Fethard, Clonmel | May 2026 | €361,000 | 365 m |
| 1 Monroe, Fethard, Tipperary | May 2026 | €315,000 | 425 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received17 November 2021
- Further information requested17 January 2022
- Further information received31 March 2022
- Decision due27 April 2022
- Decision issued25 April 2022
- Grant issued29 May 2022
- Permission expiry28 May 2027
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
To change the design of the proposed dwelling and footprint of the proposed dwelling within the site as…
Rosegreen Road , Fethard , Co Tipperary
2360332TipperaryLodged 18 May 2023Alterations
- Awaiting decisionAt this site
Development will consist of a two storey 5 bedroom house and garden shed. The development will include new…
Rosegreen Road , Fethard , Co. Tipperary
211537TipperaryLodged 19 Oct 2021New dwelling
- Granted60 m away
Construction of a dwelling, driveway entrance, domestic foul pumping station, rising main including…
Rosegreen Road , Fethard , Co. Tipperary
201111TipperaryLodged 30 Sept 2020New dwelling
- Granted60 m away
A change of house type from that previously granted under reference no. 201111 including all associated site…
Rosegreen Road , Fethard , Co. Tipperary
21673TipperaryLodged 14 May 2021Alterations
- Granted120 m away
Construction of 22 no. residential units consisting of 10 no. semi-detached 3 bedroom units, 8 no.…
An Seanline , Fethard , Co. Tipperary
21926TipperaryLodged 24 Jun 2021Housing estate
- Granted200 m away
Construction of front lobby to the existing shop and for retention of the solar panels on the roof and…
Daybreak Shop and Filling Station , Kerry Street , Fethard Co Tipperary
2660350TipperaryLodged 23 Apr 2026Commercial
- Awaiting decision260 m away
Demolition to rear of dwelling, construction of a two-storey extension to rear of existing dwelling,…
Kerry Street , Fethard , Co. Tipperary
2461059TipperaryLodged 7 Dec 2024Extension
- Awaiting decision270 m away
The demolition of an existing kitchen, bathroom, bedroom and roof located at the rear of dwelling and the…
Kerry Street , Fethard , Co.Tipperary
2461129TipperaryLodged 19 Dec 2024Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionNew dwelling
Development will consist of a two storey 5 bedroom house and garden shed. The development will include new…
Rosegreen Road , Fethard , Co. Tipperary
211537TipperaryLodged 19 Oct 2021
- InvalidExtension
The development will consist of alterations and extensions to the existing dwelling to provide a 5 bedroom…
1, Greenfield Park, Donnybrook, Dublin 4, D04 H1X7
4008/21Dublin CityLodged 3 Dec 2021
- RefusedNew dwelling
The development will consist of; the construction of a new part single storey, part two-storey, 5 bedroom,…
Greenways, Tubber Lane Road, Lucan, Co. Dublin, K78 P5V9
SD22A/0375South DublinLodged 3 Oct 2022
- GrantedNew dwelling
The construction of a two storey five bedroom dwelling house and domestic garage with connection to public…
Clegna , Cootehall , Boyle
19267RoscommonLodged 20 May 2019
- GrantedExtension
Planning permission for the development will consists of alterations and extensions to the existing dwelling…
1, Greenfield Park, Donnybrook, Dublin 4, D04 HIX7
4148/21Dublin CityLodged 22 Dec 2021
- RefusedNew dwelling
The development will consist of a new build two storey five bedroom detached house; two car parking spaces…
Ballylennon , Pollerton Little , Co. Carlow
21473CarlowLodged 2 Dec 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.