GrantedEnergyDecided 3 September 2020

Ballygammane, Thurles, Co. Tipperary

Extension of the existing ESB Thurles substation with a new transformer, control building, and associated infrastructure.

20771 · Tipperary County Council · Lodged 13 July 2020

Reference
20771
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
13 July 2020

Summary

AI-generated

Planning permission is sought for a major extension to the existing ESB Thurles 110 kV substation. The development includes a STATCOM transformer, control and valve building, lightning masts, security fencing, and temporary contractor compounds. A Natura Impact Statement has been prepared.

Energysubstationenergyinfrastructure
Floor area
233 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Construction of 1 no. A+
  • 30 mvar statcom transformer, 1 no. Auxillary transformer, 3 no. Reactors and 1 no. Outdoor cooling bank, control and valve building (233m2), 1 harmonic filter, 1 hv circuit breaker (including ct and vt), 1 mv disconnector and earth switch, 2 no. Cable sealing ends, 1 no. 110kv feeder bay, 1 busbar connection and underground connection to existing esb thurles 110 kv substation, security fencing, security gate, 7 no. 22m high lightning masts, permeable and non-permeable surfacing, additional internal access road, additional fencing to match existing 2.6 m high palisade and all other ancillary site development works and 2 temporary contractors compounds (the development is an extension to the existing substation and this extension has an overall site area (within the planning application boundary) of 1.839ha. In operation the statcom would be accessed through the existing gated entrance to the site via the local road to the immediate south. During construction, temporary access is proposed to the east of the existing substation. A natural impact statement (nis) has been prepared as part of this application)

Key dates

Timeline

  1. Application received13 July 2020
  2. Decision due6 September 2020
  3. Decision issued3 September 2020
  4. Grant issued7 October 2020
  5. Permission expiry6 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.