Planning Permission Ireland
GrantedCommercialDecided 17 November 2016

The Moorings, Davitt's Quay, Dungarvan

Retention of marquee enclosures and permission for kitchen and toilet extensions next to a protected structure.

16632 · Waterford City and County Council · Lodged 29 September 2016

Reference
16632
Authority
Waterford City and County Council
Register status
Decided
Type
RETENTION
Received
29 September 2016

Summary

AI-generated

Retention is sought for the enclosure of an existing temporary marquee and a lean-to canopy over a rear yard. Permission is also sought for kitchen and toilet extensions, a new entrance foyer, and new service access gates along a southern boundary wall which is a protected structure.

Commercialmarqueeextensionprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention permission for the enclosure of the existing temporary marquee openings, with fabric covering (north elevation) and doors and stud partitioning (south elevation) and lean to canopy over existing yard to the rear of the marquee and
  • Permission for kitchen extension, toilet extension, new entrance foyer to temporary marquee and new service access gates along southern boundary wall (a protected structure)

Land-use zoning

What this land is zoned for

TCUC
Provide for the development and enhancement of town core uses including retail, residential, commercial, civic and other uses.

National zoning type: City/Town/village Centre, central area

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Moloneys Store, Main St, DungarvanApr 2025€160,00059 m
18 Harbour Mill, Galweys Lane, DungarvanNov 2025€240,00066 m
Apt 24, Harbour Mill Davitts Quay, DungarvanJun 2025€300,00066 m
10 Harbour Mill, Dungarvan, Co WaterfordJun 2025€229,00066 m
25 Lower Main St, Dungarvan, Co WaterfordJan 2025€215,00088 m
Apt.33 - Cois Mara, Davitts Quay, DungarvanMar 2025€140,000116 m
Doolin, Apt 6 Cois Mara, Davitts QuayJun 2025€185,000116 m
Apt 28 Cois Mara, Davitt's Quay, DungarvanAug 2025€287,000116 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 September 2016
  2. Decision due23 November 2016
  3. Decision issued17 November 2016
  4. Grant issued22 December 2016
  5. Permission expiry21 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.