Planning Permission Ireland
GrantedExtensionDecided 17 October 2017

No. 13 South Parade, Waterford

Construction of a two-storey rear extension and internal alterations to a protected structure on South Parade.

17291 · Waterford City and County Council · Lodged 28 April 2017

Reference
17291
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
28 April 2017
Residential units
1
Floor area
46 m²

Summary

AI-generated

The development will consist of a new two-storey extension to the rear of the existing building, measuring 41.5 square meters on the ground floor and 4.5 square meters on the first floor. The project also includes internal alterations, the demolition of an existing rear annex and outbuildings, and connection to existing drainage. The property is a Protected Structure.

Extensionextensionprotected structuredemolition
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of a new 2 storey extension (41.5m2 to ground floor & 4.5m2 to first floor) to the rear of an existing building, internal alterations, demolition of existing annex and out buildings to the rear, connection to existing drainage and all associated site works (a protected structure rps no. 426)

Land-use zoning

What this land is zoned for

RSRS
Provide for residential development and protect and improve residential amenity.

National zoning type: Existing residential

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 South Parade, WaterfordAug 2025€460,00063 m
38 South Parade, Waterfordprice excludes VATFeb 2026€240,00077 m
42 South Parade, Waterford, WaterfordMar 2025€185,00086 m
36 Johnstown, WaterfordOct 2025€155,000101 m
42 Johnstown, WaterfordJan 2026€180,000128 m
24 Johnstown, WaterfordJun 2026€207,000138 m
2 The Old Infirmary, Johns Hill, WaterfordJan 2025€135,000147 m
402 The Old Infirmary, Johns Hill, WaterfordJul 2025€134,000147 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 April 2017
  2. Further information requested19 June 2017
  3. Further information received25 September 2017
  4. Decision due22 October 2017
  5. Decision issued17 October 2017
  6. Grant issued29 November 2017
  7. Permission expiry28 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.