Maoil a Chóirnigh, An Rinn, Dún Garbhán
Construction of a new single-storey house in An Rinn.
19429 · Waterford City and County Council · Lodged 14 June 2019
- Reference
- 19429
- Authority
- Waterford City and County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 14 June 2019
- Residential units
- 1
- Floor area
- 197 m²
Summary
AI-generatedThe application is for the construction of a new single-storey dwelling house in Maoil a Chóirnigh. It also includes alterations to the existing entrance and connection to the public sewerage system.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Ná tigh cónaithe nua aon urláir a tógaint, chomh maith athruithe a dhéanamh ar an slí isteach atá ann cheana fhéin, ceangal lesi an córas searachais poiblí agus gach gné d'oibreacha láthreáin eile a bhaineann leis
Land-use zoning
What this land is zoned for
“Provide for residential development and protect and improve residential amenity.”
National zoning type: Existing residential
Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 22 April 2021.
Notified floor area: 197 m²
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 10 Gort Na Heornan, An Rinn, Dungarvan | Apr 2026 | €540,000 | 263 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received14 June 2019
- Decision due8 August 2019
- Decision issued6 August 2019
- Grant issued11 September 2019
- Permission expiry10 September 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision50 m away
Extension to Dwelling House
Gaoth na Mara Maoil an Choirnigh , Ring , Co.Waterford
2460457WaterfordLodged 8 Aug 2024Retention
- Granted50 m away
Of extension to dwelling house
Gaoth na Mara Maoil an Choirnigh , Ring , Co.Waterford
2460521WaterfordLodged 11 Sept 2024Retention
- Granted130 m away
(1) a rear kitchen extension (2) a change in roof style from that originally granted planning permission and…
Mweelnahorna , Ring , Dungarvan
2360401WaterfordLodged 1 Sept 2023Retention
- Granted150 m away
A single storey extension to an existing single storey dwelling, new roof lights to existing roof, demolition…
An Tigín Aerach Mweelnahorna , Ring Dungarvan , Co. Waterford
2660218WaterfordLodged 8 Apr 2026Extension
- Awaiting decision190 m away
Chun tig chónaithe aon úrlar a thógaint, slí isteach, ceangal a dhéanamh leis an gcóras uisce poiblí agus…
Maoil a Chóirnigh , An Rinn , Dún Garbhán
22480WaterfordLodged 3 Jun 2022New dwelling
- Awaiting decision190 m away
Beartaímse, Séan Ó’Muirithe, iarratas a chur isteach ar Comhairle Cathrach agus Contae Phort Lairge chead…
Maoil a Chóirnigh , An Rinn , Dún Garbhán
22534WaterfordLodged 16 Jun 2022New dwelling
- Refused230 m away
The construction of 46 no. mixed storey dwellings, comprising of : 12 no. 4 bed 2-storey detached dwellings,…
Mweelahorna , An Rinn , Co. Waterford
20576WaterfordLodged 20 Aug 2020Housing estate
- Granted280 m away
The indefinite retention of — a rear extension consisting of a kitchen/living room and sunroom
2 Mweelahorna , Ring , Dungarvan
18247WaterfordLodged 13 Apr 2018Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedNew dwelling
Tigh cónaithe nua aon urláir a tógaint, chomh maith le slí isteach nua, córas searachais agus gach gné…
Gort na Daibhche Uachtarach , An Rinn , Dún Garbhán
20110WaterfordLodged 25 Feb 2020
- Awaiting decisionNew dwelling
Tigh nua aon urlár a thógaint chomh maith le slí isteach, cur leis an bother atá ann cheana fhéin, ceangal le…
Cnocán a 'Phaoraigh Uachtarach , An Rinn , Co. Phort Láirge
17779WaterfordLodged 10 Nov 2017
- RefusedNew dwelling
Tigh cónaithe nua aon urláir a tógaint, chomh maith chur leis an bother atá ann cheana féin, córas searachais…
Baile na nGall Beag , An Rinn , Dun Garbhán
18751WaterfordLodged 5 Nov 2018
- GrantedExtension
Is é atá i gceist san fhorbairt ná an síneadh le díon cothrom atá ann cheana féin a leagan go talamh, mar aon…
An Linn Bhuí Baile na nGall Mór , An Rinn Dún Garbháin , Co. Phort Láirge
2460358WaterfordLodged 1 Jul 2024
- GrantedNew dwelling
Ná tigh cónaithe nua le urláir go leith (1 1/2) a tógaint, chomh maith le slí isteach nua, ceangal leis an…
tSean Chill , An Rinn , Dún Garbhán
22820WaterfordLodged 21 Sept 2022
- RefusedChange of use
Chun aonad tráchtála atá ann cheanna fhéin a athrú isteach ina teach conaithe agus na oibreacha uilig atá ag…
Na Doiriú Theas , Baile na hAbhainn , Co na Gaillimhe
2660336galwayLodged 5 Mar 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.