Planning Permission Ireland
Awaiting decisionRetention

Mount Neill, Carrickphierish, Gracedieu

Retention of 57 houses with design alterations and drainage connections in Gracedieu.

19583 · Waterford City and County Council · Lodged 7 August 2019

Reference
19583
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
RETENTION
Received
7 August 2019

Summary

AI-generated

Retention permission is sought for 50 semi-detached houses, 1 bungalow, and 6 previously permitted semi-detached houses. The application includes alterations to glazing, front facades, roof lights, internal layouts to add a fourth bedroom, and drainage connections.

Retentionhousing estateretentionalterations
Residential units
57
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of 50 no. 2-storey 3-bed semi-detached houses and 1 no. 2 bed bungalow on a site at mount neill with previous granted planning permission as per ref. No. 06500515 together with all associated site works, landscaping boundary treatments, drainage and water connections, feature estate entrance and access road from carrickphierish road. Permission is also sought for the retention to previously granted permission as per ref. No. 8500087 for 6 no. Two storey 3-bed semi-detached houses. Alterations include changes to glazing fenestrations, material treatment to front façade, roof lights, and reconfiguration of internal layout to include a fourth bedroom within the permitted footprint. Retention is also sought for drainage and water connections

Land-use zoning

What this land is zoned for

RSRS
Provide for residential development and protect and improve residential amenity.

National zoning type: Existing residential

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
39 Blackberry Fields, Carrickpherish Road, Waterford CityAug 2025€100,000297 m
53 Ard Cluaine, Gracedieu, Waterfordnot full market priceJun 2025€108,000347 m
148 Woodbrook, Gracedieu, Waterfordprice excludes VATNov 2025€325,991486 m
149 Woodbrook, Gracedieu, Waterfordprice excludes VATNov 2025€325,991488 m
139 Woodbrook, Gracedieuprice excludes VATJun 2025€300,045494 m
150 Woodbrook Gracedieu, Waterfordprice excludes VATNov 2025€325,991494 m
151 Woodbrook, Gracedieuprice excludes VATNov 2025€281,938498 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 August 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.