Planning Permission Ireland
GrantedIndustrialDecided 28 April 2022

IDA Ireland Waterford Business & Technology Park, Cork Road, Butlerstown

Construction of a new first floor level inside an existing production building at Waterford Business Park.

22173 · Waterford City and County Council · Lodged 8 March 2022

Reference
22173
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
8 March 2022

Summary

AI-generated

The project involves constructing a new first floor within an existing double-height production area to accommodate production, laboratory, storage, and office spaces. It also includes minor elevational changes and a new external ESB substation and MV switch building.

Industrialindustrialsubstationlaboratory

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed construction of a new first floor level within the existing double height production area to accommodate additional production area, laboratory, storage areas, offices and vertical circulation routes, proposed minor alterations to the existing internal layouts, proposed minor elevational changes inclusive of new louvres, roller door and escape doors, proposed construction of a new esb substation and mv switch building external to the existing building. These works are to include all associated plant & equipment, site works, site fencing, signage, alterations to internal road network and drainage

Land-use zoning

What this land is zoned for

CDCD
Provide for light industry, general enterprise, business development, office, research and development and high technology/ high technology manufacturing type employment in a high quality built and landscaped environment.

National zoning type: Other commerce/industrial/enterprise uses

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Little Eden, Holy Cross, ButlerstownJul 2025€310,000237 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 March 2022
  2. Decision due2 May 2022
  3. Decision issued28 April 2022
  4. Grant issued14 June 2022
  5. Permission expiry13 June 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.