Planning Permission Ireland
Awaiting decisionInfrastructure

Newtown School grounds at the corner of, Wilkin Street and Passage Road, Waterford

Demolition and rebuilding of a boundary wall at Newtown School to construct a new ESB substation and electrical switch room.

2279 · Waterford City and County Council · Lodged 8 February 2022

Reference
2279
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
8 February 2022

Summary

AI-generated

The project involves demolishing a 30-metre section of a 20th-century rubble stone boundary wall and rebuilding it on a new alignment. This will enclose 62 square metres of existing footpath to construct a 30-square-metre single-storey ESB substation. The works are located within the curtilage of Newtown School, which is a protected structure.

Infrastructuresubstationschoolheritage
Storey
1
Floor area
30 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of a portion of the existing 20th century rubble stone boundary wall of approximately 30 metres long and c. 2.5m high at the junction of wilkin street and passage road. Reconstruction of the boundary wall in rubble stone to a new alignment to enclose a portion of the existing footpath to the south west of the current school boundary. This area of footpath totals 62sq. M and is currently in the control of waterford city and county council. Construction of a single storey building with flat roof of 30sq. M to house a new esb sub station and electrical switch room. The existing pedestrian entrance to the school will be reinstated in the new stone wall. The works include drainage and associated site works. The proposed works are within the curtilage of newtown school which is on the record of protected structures

Land-use zoning

What this land is zoned for

CICI
Provide for and protect civic, educational, religious, community, health care and social infrastructure.

National zoning type: Community facilities

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Wilkins St, Waterford, WaterfordJul 2025€297,50045 m
22 Passage Rd, WaterfordApr 2026€355,00090 m
5 Wilkin Court, WaterfordFeb 2025€230,00098 m
8 Passage Rd, Waterford City, WaterfordMar 2025€245,00098 m
47 Alphonsus Rd, Waterford, WaterfordApr 2026€240,000129 m
27 Passage Rd, Waterford, WaterfordJul 2025€370,000131 m
31 St Alphonsus Rd, Waterford, WaterfordApr 2025€262,500159 m
2 Sweetbriar Park, Newtown, WaterfordJun 2025€329,000180 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 February 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.