GrantedEnergyDecided 31 October 2023

Keereen Upper Woodhouse or Tinakilly and Knocknamona, Dungarvan, County Waterford

Electrical cabling, substation works, and a link road to connect Knocknamona Windfarm to Woodhouse Substation.

2360416 · Waterford City and County Council · Lodged 8 September 2023

Reference
2360416
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
8 September 2023

Summary

AI-generated

The development comprises 1,940 metres of underground electrical cabling to link the upcoming Knocknamona Windfarm to the operational Woodhouse Substation. It also includes substation upgrades, a new control building, a transformer, lightning masts, a 190-metre link road, and forestry road widening.

Energywind energyinfrastructuregrid connection
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development comprising of : a) 1940m of underground electrical cabling in keereen upper and knocknamona townlands, linking knocknamona windfarm (to be constructed) to the woodhouse substation (operational). B) works within the existing woodhouse substation compound in keereen upper, comprising a new control building 5.3m x 3.8m and 4.6m high; a 110kv electrical transformer c. 6m in height, with associated plinth and bund; an electrical transformer bay; 2 no. Lightening masts 17.5m in height and ancillary electrical equipment. Works within the woodhouse substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and 2 no. Gateways in the existing perimeter fence. C) a link road, 190m in length and 4.5m in width connecting the existing forestry road network at knocknamona windfarm to the existing woodhouse windfarm access roads. It is proposed to use this link road and the existing woodhouse windfarm access roads to facilitate the delivery of turbine components to knocknamona windfarm. D) the widening of 960m of existing forestry road by 1m, in knocknamona townland to facilitate the delivery of turbine components to knocknamona windfarm and;e) all ancillary site works.

Key dates

Timeline

  1. Application received8 September 2023
  2. Decision due2 November 2023
  3. Decision issued31 October 2023
  4. Appeal submitted27 November 2023
  5. Appeal decided31 March 2025
  6. Permission expiry30 March 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.