Planning Permission Ireland
Awaiting decisionHousing estate

Ard Rua, Quarry Road Bilberry Road, Waterford

Construction of 13 houses and completion of 6 houses under construction.

2460144 · Waterford City and County Council · Lodged 26 March 2024

Reference
2460144
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
26 March 2024

Summary

AI-generated

Planning permission is sought to build 13 three-storey houses (one detached and 12 semi-detached) and to complete 6 semi-detached two-storey houses currently under construction. This forms part of the Ard Rua housing development.

Housing estatehousing estateresidential
Residential units
19

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

To build thirteen houses __ house no. 26 to house no. 38 (incl), being one detached, three floored dwellinghouse and twelve semi detached, three floored dwellinghouses and also permission to complete the building of the six semi detached, two floored houses as are under construction__ house no. 20 to house no. 25 (incl)__ both as part of their ard rua housing development (originally permitted under ref no. 12/500066 and ref no. 18/804), together with (a) access from the adjoining public road (quarry road), through existing estate road no. 1__ already built and servicing existing completed and occupied houses, (b) completion of all associated site development work and (c) the installation of all necessary services __for the nineteen houses forming the subject of this application all at their existing housing development site at

Land-use zoning

What this land is zoned for

R1R1
Provide for new residential development in tandem with the provision of the necessary social and physical infrastructure.

National zoning type: New/proposed residential

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
30 Ard Rua, Gracedieuprice excludes VATNov 2025€330,39614 m
28 Ard Rua, Gracedieuprice excludes VATDec 2025€361,23353 m
26 Ard Rua, Quarry Road, Gracedieuprice excludes VATMay 2026€495,00053 m
27 Ard Rua, Ard Rua, Gracedieuprice excludes VATJan 2026€361,23453 m
29 Ard Rua, Gracedieu, Waterfordprice excludes VATDec 2025€361,23374 m
31 Ard Rua, Quarry Road, Gracedieuprice excludes VATNov 2025€361,23474 m
32 Ard Rua, Gracedieu, Waterfordprice excludes VATNov 2025€367,18074 m
37 Ard Rua, Quarry Road, Gracedieuprice excludes VATMay 2025€341,850124 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 March 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.