Keiloge, Ballygarron Upper, Co. Waterford
Modifications to a permitted solar farm substation in Keiloge, Co. Waterford.
2460430 · Waterford City and County Council · Lodged 26 July 2024
- Reference
- 2460430
- Authority
- Waterford City and County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 26 July 2024
Summary
AI-generatedThe development consists of modifications to a previously permitted solar farm. It includes amending the design and layout of the on-site 20kV substation to meet modern ESB standards, replacing two permitted switch rooms with one combined switch room, and associated site works.
- Floor area
- 55 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development will consist of: modifications to the permitted solar farm (pl. Ref. 17/113, abp ref. Pl93.248487). The modifications are within the boundary of the permitted development and will comprise of:the amendment of the design and layout of the permitted on-site 20kvsubstation to adhere to modern esb standards; - amendments include exclusion of the permitted 2 no. Switch rooms and the development of 1 no. Combined switch room (55.19 sq. M) and other minor amendments; the proposed development includes all associated site works and ancillary infrastructure
Land-use zoning
What this land is zoned for
“Provide for transport and utilities infrastructure.”
National zoning type: Other networks and basic infrastructure/utilities uses
Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received26 July 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Modifications to the permitted solar farm (Pl. Ref. 17/113, ABP Ref. PL93.248487). The modifications are…
Keiloge , Ballygarron Upper , Co. Waterford
2460467WaterfordLodged 14 Aug 2024Energy
- Refused340 m away
The development of a solar photovoltaic panel array consisting of the up to 26,000sq.m of solar panels on…
Keiloge , Co. Waterford
17113WaterfordLodged 20 Feb 2017Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Modifications to the permitted solar farm (Pl. Ref. 17/113, ABP Ref. PL93.248487). The modifications are…
Keiloge , Ballygarron Upper , Co. Waterford
2460467WaterfordLodged 14 Aug 2024
- GrantedEnergy
Permission for modifications to permitted solar farm (Pl.Reg.No. 17/4596). The modifications are within the…
Barryscourt, Carrigtwohill, Co Cork,
245277corkLodged 5 Jul 2024
- RefusedEnergy
For development. The development will consist of amendments to the design of the ESB substation, revised…
GRANGE LOWER , GORESBRIDGE , CO. KILKENNY
2360121KilkennyLodged 24 Mar 2023
- GrantedEnergy
For development. The development will consist of amendment to the design of the ESB substation, revised…
GRANGE LOWER , GORESBRIDGE , CO. KILKENNY
2360446KilkennyLodged 6 Oct 2023
- GrantedEnergy
For development. The proposed development consists of an amendment to Planning Permission reference 161 as…
Grange Lower , Goresbridge , County Kilkenny
21649KilkennyLodged 28 Jul 2021
- GrantedEnergy
The development will consist of a 10 year permission for a solar farm comprising: the installation of…
Kilkeelan , Athboy , Co. Meath
KA161206MeathLodged 9 Nov 2016
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.