GrantedRetentionDecided 24 June 2026

Knockdrin Castle, Knockdrin, Co. Westmeath

Retention of restoration works and services at Knockdrin Castle.

2560402 · Westmeath County Council · Lodged 8 August 2025

Reference
2560402
Authority
Westmeath County Council
Register status
Decided
Type
RETENTION
Received
8 August 2025

Summary

AI-generated

Retention is sought for the restoration and refurbishment of Knockdrin Castle, a Protected Structure, including guest bedrooms, dining areas, and services. The application also covers works to the entrance gates and lodges.

Retentioncastleprotected structureretentionhotel

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For retained development, and for proposed development and change of use, all at knockdrin castle and within its curtilage (a protected structure – rps ref: 012-022), a site of circa. 10.48 hectares. A natura impact statement (nis) accompanies this application. The development for which retention is sought comprises
  • The restoration and refurbishment of knockdrin castle (a protected structure – rps ref: 012-022), including 12 no. Guest bedrooms, ground floor dining area, bar, ballroom and kitchen
  • The retention of replacement kitchen windows to the rear of the building and replacement of modern conservatory extension to the east side of the building
  • Retention of drainage services, water supply services, wastewater services (100pe concrete sewage treatment system discharging to 165 sqm percolation area), utilities, and fire safety services associated with the above restoration and refurbishment works
  • Works to the knockdrin castle entrance gates & lodges (north & south – protected structures – rps ref: 012-020 & 012-021 respectively), as include the provision of new entrance gates. The proposed development for which permission is sought comprises
  • Proposed change of use of knockdrin castle from residential to an events and hospitality venue as incorporates dining and overnight accommodation
  • Proposed use of existing vehicular access points to the r394 as comprise the knockdrin castle gate lodge, south (a protected structure – rps ref: 012-021) and secondary, north entrance gateway (a protected structure – rps ref: 012-020) to serve the development
  • Proposed partial realignment of existing wall adjacent to the secondary, north entrance gateway (a protected structure – rps ref: 012-020) for the provision of improved sightlines
  • Proposed enhancements to internal access roads, as includes continuation of existing access route to front curtilage of knockdrin castle, and all associated vehicular and pedestrian wayfinding signage
  • Proposed provision of 74 no. Car parking spaces (including 4 no. Accessible parking spaces) and 2 no. Coach parking spaces to serve the operational and customer needs of the development
  • Proposed enclosed waste storage area in the internal courtyard of knockdrin castle
  • Proposed hard and soft landscaping works, as include the restoration and enhancement of formal gardens, pedestrian footpaths, enhanced reception area to front curtilages of knockdrin castle, and proposed external lighting

Key dates

Timeline

  1. Application received8 August 2025
  2. Further information requested2 October 2025
  3. Further information received16 January 2026
  4. Decision due24 June 2026
  5. Decision issued24 June 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.