Planning Permission Ireland
RefusedIndustrialDecided 9 October 2025

Rahinmore, Co. Westmeath, Ireland

Continued use and lateral extension of a sand and gravel quarry in Rahinmore.

2560409 · Westmeath County Council · Lodged 15 August 2025

Reference
2560409
Authority
Westmeath County Council
Register status
Decided
Type
PERMISSION
Received
15 August 2025

Summary

AI-generated

The application seeks to continue quarrying operations over a 4.939-hectare area for 10 years, with an additional 3 years for restoration. It includes extending the quarry void, extracting 400,000 cubic metres of material, and operating an on-site washing and processing plant.

Industrialquarryextractionindustrialrestoration

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Development which will consist of the following
  • Continue the use of a quarry over an area of 4.939 ha to a maximum depth and reduced floor level of 80.000m. Excavation of sand and gravel will take place over an area of 4.71 ha
  • It is proposed to continue extraction activities in the authorized existing quarry as already granted by an bord pleanála (ref no
  • Su. 0002), void above the water table, and to laterally extend the existing quarry void to the north/northwest
  • The proposed duration of excavation is 10 years, to reflect anticipated extraction of remaining reserves and depending on market conditions and a further 3 years for restoration
  • Inclusion of all site screening and landscaping works including end of operation restoration to agricultural use
  • The development will consist of removal of approximately 400,000m3 of sand and gravel from the site via the public road. The excavated material will comprise sand and gravel which will be extracted by mechanical means. The extracted sand and gravel material will be transported to an onsite central plant area for washing, grading and processing as per nsai certification
  • The infill and restoration of the existing end of life quarry excavated areas with approximately 250,000m3 of clean inert soil and stone (375,000 tonnes assuming a density of 1.5) to restore the lands to agricultural uses as required under the conditions of the substitute consent granted in 2013 and not undertaken by the previous operator. The infill would be completed under an article 27 of the european communities (waste directive) regulations 2011 (s. I. No 126 of 2011) or under a local authority waste facility permit under the waste management act 1996-2008
  • Installation of a new site entrance, access track and lockable gates
  • Installation of a wheel wash, and temporary portaloo toilets (self-contained) and hard standing quarantine area with a cubic meter skip
  • Reuse of existing weighbridge onsite, use of entrance, internal access, existing buildings and facilities; and
  • All other associated site works and ancillary activities, including site management, security fencing, internal surface water management, and road management including approaching passing bays

Key dates

Timeline

  1. Application received15 August 2025
  2. Decision due9 October 2025
  3. Decision issued9 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.