Planning Permission Ireland
GrantedExtensionDecided 9 April 2020

Abberann, Drumbawn, Newtownmountkennedy

Demolition of a sunroom to build a two-storey side extension and raise the roof for dormer accommodation.

20182 · Wicklow County Council · Lodged 24 February 2020

Reference
20182
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
24 February 2020

Summary

AI-generated

The application proposes the demolition of an existing 9.3 sqm rear sunroom and the construction of 144 sqm of extensions. This includes a new front porch, a two-storey side extension, raising the ridge level to provide first-floor dormer accommodation, and upgrading the wastewater system.

Extensionextensiondemolitiondormer
Storeys
2
Floor area
144 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Extensions / elevational changes to existing 147.2 sqm detached bungalow, proposed works include (1) demolition of existing 9.3 sqm rear sunroom, proposed extensions totalling 144 sqm to include new front porch, two storey side extension, raising of existing ridge level to provide first floor habitable dormer accommodation, proposed upgrade of on site wastewater system, all of the above works together with ancillary site works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Rowelyn, Drumbawn, NewtownmountkennedyMay 2025€660,000132 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 February 2020
  2. Decision due14 June 2020
  3. Decision issued9 April 2020
  4. Grant issued30 June 2020
  5. Permission expiry29 June 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.