Planning Permission Ireland
Awaiting decisionExtension

San Miguel. Glencormack South, Kilmacanogue Bray, Co Wicklow

Extensive alterations and extensions to a home, including a garage conversion, new bay windows, and solar panels.

2460432 · Wicklow County Council · Lodged 20 July 2024

Reference
2460432
Authority
Wicklow County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
20 July 2024

Summary

AI-generated

The project involves converting an existing garage and boiler area into a bedroom and office, raising the garage roof, and adding multiple bay windows. It also includes replacing dormer windows, installing external insulation and solar panels, removing two sunrooms, and installing a new wastewater treatment unit.

Extensionrenovationsolargarage conversioninsulation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations and extensions to existing single storey (with converted attic and dormer windows) home. The application includes conversion of the existing garage and boiler area for use as a master bedroom and home office, internal reconfiguration of the existing living kitchen and ancillary areas, the addition of a utility and toilet area, the addition of one large bay window to the north elevation, the addition of one large bay window to the east elevation, and the addition of two additional bay windows to the south elevation. It includes replacement of the existing rear dormer window with a similar dormer of squared-off contemporary styling, and the replacement of the front dormer window with a new longer dormer window to serve three rooms. It includes raising the roof of the former garage area by 400mm, and the provision of a bay window at the new masterbedroom location. It includes the installation of external insulation, and solar panels, and it includes the provision of a large patio area at the new east-facing bay window. It includes removal of two old sun-rooms from the south elevation. Finally, it includes the provision of a 6 person eurobio waste water treatment unit with 120 sq metres of soil polishing filter in accordance with epa 2009 standards, all to replace the existing septic tank

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Camrock, Rocky Valley Dr, EnniskerryJul 2025€1,372,500226 m
Karinya, Glencormick North, BrayJun 2025€875,000329 m
Ringwood House, Hollybrook, KilmacanogueOct 2025€730,000491 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 July 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.