Planning Permission Ireland
GrantedExtensionDecided 29 October 2025

The Beaches, Coolmore, Arklow

Construction of a two-storey extension and front porch to a house in Arklow.

2560108 · Wicklow County Council · Lodged 20 February 2025

Reference
2560108
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
20 February 2025

Summary

AI-generated

The development consists of a new two-storey dormer-style extension to the side of the existing detached dwelling, providing a new bedroom, study, and bathrooms. It also includes a new single-storey front porch, a bay window, and connection to a shared wastewater treatment facility.

Extensionextensiondormerporch
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of a proposed new 2-storey dormer style extension comprising of a new bedroom and replacement bathroom at ground floor level with a new study & bedroom with replacement ensuite at first floor level to the north-west side of the existing single storey detached dwelling together with a proposed new single storey bay window & front entrance porch extension to the front (south-west) elevation including a new velux rooflight to the rear serving the utility with all wastewater connecting into the existing shared coolmore park grouped wastewater treatment facility

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Coolemore, Scratnagh, ArklowMay 2025€185,000197 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 February 2025
  2. Further information requested11 April 2025
  3. Further information received6 October 2025
  4. Decision due2 November 2025
  5. Decision issued29 October 2025
  6. Grant issued2 December 2025
  7. Permission expiry1 December 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.