RefusedIndustrialDecided 27 August 2025

Site located in the townland of Moneybig and Bogland, to the north of Existing Kish Business Park, Arklow

Construction of two large warehouses and a 15.7-hectare solar farm in Arklow.

2560516 · Wicklow County Council · Lodged 9 July 2025

Reference
2560516
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
9 July 2025

Summary

AI-generated

The development consists of two warehouse buildings totaling approximately 6,728 sqm with associated offices, service yards, and loading docks. It also includes a solar farm development covering approximately 15.7 hectares with ground-mounted photovoltaic panels.

Industrialwarehousesolarindustrial
Floor area
6,728 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

- 2 no. Warehouse buildings with a gross floor area (gfa) of c. 3,364 sq. M each and a total height of c. 14.1m. Each warehouse includes a warehouse area of c. 2,419 sq. M, reception area, office, staff facilities, toilets, plant and storage areas at ground floor level, and office space, meeting rooms, staff facilities, toilets, plant and storage facilities at mezzanine level (c. 581 sq. M). - the provision of a service yard with a security hut (c. 34 sq. M) located at the main entrance, hgv unloading areas and 4 no. Associated loading bay docks on the eastern elevation of each warehouse building. - the provision of 68 no. Car parking spaces including 4 no. Accessible spaces and 10 no. Ev parking spaces serving staff and visitors. - the provision of 40 no. Cycle parking spaces serving staff and visitors. - the provision of a sprinkler tank, sprinkler pump house (c. 13.3 sq. M), fire hydrant tank, hydrant pump house (c. 13.3 sq. M) and esb substation (c. 25 sq. M) - construction of a solar farm development consisting of photovoltaic (pv) panel arrays covering an area of approximately c. 15.7 ha on ground mounted steel frames, associated power trunk building (c. 539 sq. M) and 2 no. Transformer compounds, underground cabling and ducting, new internal tracks for maintenance and all associated site services works. - site access from the permitted development to south (wcc reg. Ref. : 20/1088 as amended wcc reg. Ref. : 23/62 and 24/88), which is subject to a current separate amendment application under wcc reg. Ref. : 25/60350, and extension of the permitted inner relief road through the site. - the provision of a new statcom compound including a single storey control and valve building with a gfa of c. 253 sq. M and associated equipment adjacent to the permitted inner relief road to the south of the main site area. The proposed development also includes for the provision of associated landscaping and planting, berms, boundary treatments, internal road network, pedestrian and cyclist infrastructure, signage zones, site lighting, drainage works, sustainable drainage systems (suds) and all ancillary site development works

Key dates

Timeline

  1. Application received9 July 2025
  2. Decision due2 September 2025
  3. Decision issued27 August 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.