Planning Permission Ireland
GrantedApartmentsDecided 15 February 2022

Bray Head House and the former NOrth Wicklow Educate Together Secondary School, Putland Road and extending to Newcourt Road, Bray

Demolition of school extensions and construction of 179 apartments, including refurbishment of a protected structure.

SH202104 · Wicklow County Council · Lodged 23 November 2021

Reference
SH202104
Authority
Wicklow County Council
Register status
Decided
Type
N/A
Received
23 November 2021
Residential units
179
Floor area
14300.9 m²

Summary

AI-generated

The development involves the demolition of non-original outbuildings and a 1950s school extension. Bray Head House, a protected structure, will be refurbished and converted into apartments, alongside the construction of three new apartment blocks containing 179 units, a creche, and basement parking.

Apartmentsapartmentsprotected structurecrechedemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of:-non-original shed and outbuildings to the rear of bray head house; the 1950s 2/3 storey redbrick secondary school extension to bray head house; other shed and outbuildings to the rear of the site; refubishment of bray head house (protected structure) with internal reconfiguration and change of use from school to apartments; the construction of 3 no. Residential apartment buildings (block a, b and c) with common basement under podium amnenity space; provision of 179 residential apartment units. The units will be provided across 4 no. Buildings arranged around a central landscaped podium; the under-podium basement level will accommodate 142 no. Car parking spaces, bicycle parking, bin stores and plant; a creche will be located at ground floor level of block a; 12 no. Surface level car parking spaces will be provided allocated for bray head house units and drop off area for creche along with surface level bicycle parking; widening of existing vechicular access from putland road to newcourt road; site landscaping, boundary treatments, infrastructure works, esb substation and all associated site works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
73 Headlands, Putland Rd, BrayJun 2026€536,00054 m
81 The Headlands, Bray, WicklowJan 2025€490,00069 m
85 The Headlands, Putland Rd, BrayMay 2025€495,00078 m
70 The Headlands, Putland Rd, BrayMay 2025€400,00099 m
10 Bay View, The Headlands, Putland RoadAug 2025€630,000110 m
17 Mountain View, The Headlands, Putland Rd BrayMay 2025€302,000113 m
18 Mountain View, The Headlands, Putland Rd BrayJul 2025€387,000113 m
57 The Headlands, Putland Rd, BraySept 2025€475,000116 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 November 2021
  2. Decision due26 January 2022
  3. Decision issued15 February 2022
  4. Grant issued23 March 2022
  5. Permission expiry22 March 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.