Planning Permission Ireland
GrantedIndustrialDecided 20 April 2017

Ballintrane, Fenagh, Co Carlow

Extensions and canopies at O'Toole Composting and Recycling facility in Fenagh.

16292 · Carlow County Council · Lodged 30 September 2016

Reference
16292
Authority
Carlow County Council
Register status
Appealed
Type
PERMISSION
Received
30 September 2016

Summary

AI-generated

The development consists of constructing extensions to both the recycling and composting facilities, totaling over 1,200 sq m. It also includes several lean-to canopies for sheltered storage and vehicle parking, and an airlock to improve environmental performance.

Industrialrecyclingcompostingindustrialextension
Floor area
3,377 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development on an overall site of approximately 4.85 hectares at o'toole composting and recycling, ballintrane, fenagh, co. Carlow, r21 y099. The development will consist of the: construction of an extension to the east of the existing recycling facility (1179 sq m approximately); construction of an extension to the north-west to existing composting facility (66 sq m approximately); construction of a 'lean-to' canopies to the eastern side of the proposed extension to the recycling facility (549 sq m approximately),to western side of the existing recycling facility building (549 sq m approximately) and to northern side of the existing composting facility (753 sq m approximately) to provide sheltered storage and vehicle parking areas; the construction of an airlock to northern side of the existing composting facility (281 sq m approximately); and all other associated site excavation, infrastructural and site development works above and below ground. The purpose of the proposed development is to improve efficiency and the environmental performance of the recycling and the composting facilities only. There is no change of use proposed as part of this development nor is there any proposed intensification of use. The application relates to development which comprises or is for the purposes of an activity requiring an industrial pollution prevention and control license (now replaced by an industrial emmissions license)

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 July 2022.

Notified floor area: 1,245

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 September 2016
  2. Further information requested23 November 2016
  3. Further information received24 March 2017
  4. Decision due20 April 2017
  5. Decision issued20 April 2017
  6. Appeal submitted12 May 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.