Planning Permission Ireland
GrantedIndustrialDecided 17 July 2020

Clorusk Lower, Royal Oak, Bagenalstown

New plant, equipment, and cooling systems at a distillery in Bagenalstown.

20142 · Carlow County Council · Lodged 7 May 2020

Reference
20142
Authority
Carlow County Council
Register status
Decided
Type
PERMISSION
Received
7 May 2020

Summary

AI-generated

The development at this protected distillery site includes a new water cooling system with a 120m3 storage bund, a new centrifugation unit with an access gantry, and spirit chilling units. It also involves minor alterations to the existing distillery building.

Industrialdistilleryindustrialheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For the provision of new plant and equipment to include (i) new water cooling system to consist of cooling units, water storage bund (120m3 capacity), new covered pump bay (34m2) and new services gantry linking to existing distillery (ii) new centrifugation unit, to consist of centrifugal decanter, storage tank and pumps, screw conveyor and associated access gantry / walkway (25m2) with ladders / stairs, linked to existing distillery at first floor level (iii) new spirit chilling units (iv) alterations to existing distillery to consist of new first floor door linked to decanter gantry / walkway and (v) all associated site development works. (protected structure ref cw 46). The proposed development has been subject to appropriate assessment and a report for aa screening has been prepared

Land-use zoning

What this land is zoned for

Enterprise and EmploymentSI
To promote and provide for the development of enterprise and employment generating uses

National zoning type: Industrial, enterprise, employment

Objective set by the Carlow_County_Development_Plan_2022_2028_Variation_Number_2_Muine_Bheag_Royal_Oak_District_Town_Plan_2026 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received7 May 2020
  2. Decision due1 July 2020
  3. Decision issued17 July 2020
  4. Grant issued19 August 2020
  5. Permission expiry18 August 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.