GrantedEnergyDecided 19 March 2026

Within the townlands of Woodpark TD and Leitrim TD, near Bridgetown, Co. Clare

Construction of a battery energy storage system compound and associated infrastructure near Bridgetown.

2560794 · Clare County Council · Lodged 12 December 2025

Reference
2560794
Authority
Clare County Council
Register status
Appealed
Type
PERMISSION
Received
12 December 2025

Summary

AI-generated

The development on a 3.58-hectare site will consist of a co-located Battery Energy Storage System (BESS) compound. It includes 32 battery storage units in metal shipping containers, 8 inverter stations, grid compliance equipment, and access via an upgraded quarry entrance.

Energyenergybatterybessinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development, on an overall site of 3.58 hectares, will consist of: a co-located battery energy storage system (bess) compound with associated internal access tracks; access to the proposed bess compound will be from the r466 local road and will consist of the use of an existing quarry entrance in the townland of leitrim which will be upgraded as permitted as part of the fahy beg wind farm (under clare county council ref: 23148 & acp ref 317227); installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent fahy beg 38kv substation. The grid code compliance equipment will include: backup generator, neutral earthing resistor (ner), auxiliary house transformer, marshalling kiosks; 3 no. Spare parts shipping containers (measuring 12.2 m (l) x 2.4 m (w) x 2.6 m (h)); and associated ancillary development. Installation of 32 no. Battery energy storage units comprising metal shipping containers housing batteries (measuring 6 m (l) x 2.4 m (w) and 2.9 m (h) each), and associated ancillary control and ventilation units; installation of 8 no. Medium voltage (mv) inverter stations comprising metal shipping containers housing the inverter, mv transformer, and an mv-lv room (measuring 6 m (l) x 2.4 m (w) and 2.9 m (h) each); installation of 1 no. Water storage tank (measuring 5.15 m (l) x 4.15 m(w) x 2.58 m (h)); construction of 250m of new access tracks; provision of a crane hardstanding area to facilitate lifting operations on site (280m2); provision of 10 no. Car parking spaces (8 no. Standard parking spaces, and 2 no. Accessible parking spaces); reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; underground electrical and communications cabling; security lighting, cctv and communications mast; provision of 150m of sound reflective barriers; security fencing and gates; drainage system including on-site surface water attenuation ponds; tree felling of 0.19 ha (1,890m2) to facilitate required clearance for bess compound, associated earthworks and drainage infrastructure; removal of 109m of hedgerow to facilitate development of the bess compound, and replanting of 109m at perimeter locations; and all associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The applicant requests that the development be

Key dates

Timeline

  1. Application received12 December 2025
  2. Decision due19 March 2026
  3. Decision issued19 March 2026
  4. Appeal submitted15 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.