Summary
AI-generatedThe application seeks to amend a previously permitted Battery Energy Storage System (BESS) and substation in Booltiagh. Changes include peat excavation, a reduced footprint for 32 battery array units, a revised control room, and new transformer skids.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
For development at this site measuring c. 1.42 ha located within the townland of booltiagh, ennis, co. Clare. The development seeks to amend the battery energy storage system (bess) development permitted under ref. 23/60414 and the existing permanent 110kv booltiagh substation permitted under ref. 00/567 (acp ref. 120616) amended by ref. 11/340, which are both co-located with the existing and operational booltiagh wind farm. There are no proposed amendments to the permitted and operational wind farm. The amendments to the permitted bess will consist of the excavation and removal of 0.36ha of peat within the proposed fenced bess enclosure area and the import of equivalent amount of stone to level the site; a revised bess enclosure to occupy a reduced footprint and layout for the construction and operation of reduced battery array units (32 nos. ) with built in inverters resulting in the exclusion of permitted standalone inverters; a revised control & scada room, inclusion of 2 no. Auxiliary transformer units, 1 no. Storage container, and 1 no. Standby generator and fuel tank; replacement of permitted mva transformers with 8 no. Mva skids (transformers and switchgear); and a revised gated access point and roads; and the installation of a 230m long 20kv underground interconnector cable to connect the bess control and scada room to the existing 110kv booltiagh substation. The amendments to the permitted 110kv substation will consist of the replacement of the grid transformer in the ipp compound including 110kv circuit breaker, combined ct/vt, disconnector, earth switch and surge arrestors, two post insulators, two auxiliary transformers, one house transformer, one generator and diesel tank and underground cabling trenching; and revisions to permitted ancillary infrastructure layout including security fencing, lighting, lightening masts, two interface kiosks, and cctv. This application seeks a 10-year duration of planning permission and 35-year duration of operational lifetime of the permitted bess infrastructure. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply
Key dates
Timeline
- Application received31 October 2025
- Further information requested4 February 2026
- Further information received13 May 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decisionAt this site
The development will consist 10 year planning permission for the construction and operation of battery arrays…
Booltiagh , Ennis , Co. Clare
2360404ClareLodged 29 Sept 2023Energy
- GrantedAt this site
For development which will consist of the installation of battery arrays located within container units (18…
Booltigh , Ennis , Co Clare
18555ClareLodged 6 Jul 2018Energy
- Awaiting decisionAt this site
To Extend the appropriate Period of Planning Permission for P18/555 for development which will consist of the…
Booltiagh , Ennis , Co. Clare
23238ClareLodged 24 Apr 2023Energy
- GrantedAt this site
For development which will consist of a 10 year planning permission for the construction and operation of…
Booltiagh , Ennis , Co. Clare
2360414ClareLodged 6 Oct 2023Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
Battery Energy Storage System (BESS) development which will consist of a new site entrance and access track,…
Ballygammane and adjacent to existing Thurles 110kV substation , Thurles , Co. Tipperary
2560848TipperaryLodged 29 Aug 2025
- GrantedEnergy
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy…
Lands at , Coolshamroge , Co. Clare
2560747ClareLodged 1 Dec 2025
- Awaiting decisionEnergy
The development will consist of a Battery Energy Storage System (BESS) facility and Solar Farm comprising of…
In the townlands of Derryroe and Kilberrihert, Co. Cork
26/0335corkLodged 13 Feb 2026
- Awaiting decisionEnergy
A renewable energy development with a maximum storage capacity of 596mw/h in a development of a Battery…
Carriglong , Tramore , County Waterford
2560782WaterfordLodged 5 Nov 2025
- GrantedEnergy
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy…
Within the townlands of Woodpark TD and Leitrim TD , near Bridgetown , Co. Clare
2560794ClareLodged 12 Dec 2025
- GrantedEnergy
A Battery Energy Storage System (BESS) development to consist of a new site entrance and access track, site…
Ballygammane and adjacent to the existing Thurles 110kV substation , Thurles , Co. Tipperary
2560940TipperaryLodged 22 Sept 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.