Planning Permission Ireland
Awaiting decisionIndustrial

Smithstown Industrial Estate, Smithstown Road, Smithstown Shannon

Construction of a large mixed-use commercial warehouse with offices and parking in Shannon.

2660253 · Clare County Council · Lodged 20 April 2026

Reference
2660253
Authority
Clare County Council
Register status
In progress
Type
PERMISSION
Received
20 April 2026

Summary

AI-generated

The development consists of a 6,095 sq.m. warehouse with 1,000 sq.m. of ancillary office space. It includes a new access road, 122 parking spaces, an ESB sub-station, and the demolition of existing derelict structures.

Industrialwarehouseindustrialdemolition
Floor area
7,095 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development which will consist of the construction of a mixed-use commercial building (warehouse) comprising a gross floor area of 6,095sq. M. With ancillary office accommodation (1,000sq. M. ), new access road off smithstown road, new site entrance, loading bays, hgv circulation and parking,122 no. On-site parking spaces, boundary fencing, esb sub-station, demolition of existing derelict structures, relocation of existing overhead power lines, and connection to existing utilities together with ancillary site development works

Land-use zoning

What this land is zoned for

Light IndustrySI
The use of land for light industry shall be taken to incl. uses where the primary activity is the manufacture of a physical product. The use for ind./manufacturing, incubator units, distribution, open storage, transport operating centres etc is accept.

National zoning type: Industrial, enterprise, employment

Objective set by the Shannon Town and Environs Local Area PLan (2012–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
58 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€321,600341 m
62 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€306,600341 m
61 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€286,600341 m
60 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€286,600341 m
59 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€306,600341 m
77 Radharc Doire, Smithstown, Shannonprice excludes VATJun 2026€414,096432 m
75 Radharc Doire, Smithstown, Shannonprice excludes VATFeb 2026€436,123484 m
74 Radharc Doire, Smithstown, Shannonprice excludes VATDec 2025€436,123487 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 April 2026
  2. Further information requested12 June 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.