Planning Permission Ireland
GrantedCommercialDecided 30 October 2019

Building B, Penrose Dock Office Development ( under constructi, bounded by Penrose Quay Railway St Alfred St

Modifications to an office building under construction at Penrose Dock, Cork City.

1938606 · Cork City Council · Lodged 7 August 2019

Reference
1938606
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
7 August 2019

Summary

AI-generated

Permission is sought for modifications to Building B of the Penrose Dock office development. The changes include a new ground floor pedestrian access, a lobby, an ESB substation, and staff facilities, within the curtilage of a protected structure.

Commercialofficeprotected structurecity centre

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which will consist of the construction of modifications to building b of the penrose dock office development ( as permitted under cork city council planning reference 18/37909 ad under construction) bounded by penrose quay/ railway street/ alfred street, cork city. The proposed development includes the provision of a new ground floor pedestrian access and lobby from alfred street, and an esb substation and additional staff facilities. The proposed development will result in a reduction in part of the permitted ground floor office floorspace of building b. The proposed development is within the curtilage of the former city of cork steampacket offices (penrose house), protected structure (reference ps281).

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 St Patricks Terrace, Lower Glanmire Road, CorkJul 2025€150,000124 m
8 Adelaide Terrace, Summerhill North, CorkDec 2025€480,000222 m
Apt 1 - 3 York Terrace, Summerhill North, CorkDec 2025€450,000234 m
19 Summerhill North, Cork, CorkMar 2025€850,000234 m
30 Wellington Rd Apt 1, Cork City, CorkNov 2025€250,000246 m
Apartment 2, 30 Wellington Road, CorkNov 2025€250,000246 m
Apartment 4, 30 Wellington Road, CorkNov 2025€250,000246 m
Apartment 3, 30 Wellington Road, CorkNov 2025€250,000246 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 August 2019
  2. Decision due30 October 2019
  3. Decision issued30 October 2019
  4. Grant issued10 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.