Express Red Long Term Car Park, Cork Airport, Lehenaghmore
Construction of a new substation and generator at Cork Airport long-term car park.
2140328 · Cork City Council · Lodged 1 July 2021
- Reference
- 2140328
- Authority
- Cork City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 1 July 2021
Summary
AI-generatedThe project involves building a new 10kV single-storey substation with a generator, diesel tank bund, fencing, and pedestrian safety measures. The development will require the removal of 63 long-term car parking spaces.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development which will consist of the construction of a new 10kv single-storey substation with a lean-to incorporating a diesel tank bund; generator; fencing and gates; pedestrian barriers; new pedestrian crossing and traffic calming; road markings; and all site development and drainage works adjacent to the existing substation. The proposed development will require the removal of 63no. Long-term car parking spaces.
Land-use zoning
What this land is zoned for
“To promote and support the operations of Cork International Airport.”
Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 11 May 2022. A completion certificate was lodged on 4 October 2023.
Notified floor area: 420 m²
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received1 July 2021
- Decision due25 August 2021
- Decision issued25 August 2021
- Grant issued6 October 2021
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted60 m away
Permission for development on land to the south-east of the Old Terminal Building at Cork Airport, Lehenagh…
Lands to the south-east of the , Old Terminal Building at , Cork Airport
2443252Cork CityLodged 12 Sept 2024Infrastructure
- Granted120 m away
Permission for retention of taxi holding area and — Permission for modifications to the existing internal…
Cork Airport, Lehenagh More, Co Cork,
186140corkLodged 14 Aug 2018Infrastructure
- Granted240 m away
Erection of 1 no. illuminated free standing double faced sign
Radisson SAS Hotel, Cork Airport, Lehenagh More,
084275corkLodged 23 Jan 2008Commercial
- Granted250 m away
Permission for retention of taxi holding area and — Permission for modifications to the existing internal…
Cork Airport , Lehenagh More , Co Cork
186140Cork CityLodged 14 Aug 2018Infrastructure
- Granted250 m away
Extensions to hotel to include (a) construction of a 3 storey 57 bedroom block extension, (b) a single storey…
Great Southern Hotel, Cork Airport, Lehenaghmore,
049546corkLodged 31 Dec 2004Commercial
- Granted260 m away
For permission at Cork Airport Hotel, Cork Airport, Lehenaghmore, Cork, for the construction of a permanent…
Cork Airport Hotel , Cork Airport , Lehenaghmore
2443019Cork CityLodged 20 Jun 2024Commercial
- Awaiting decision260 m away
Permission for a single-storey detached building to the rear of the existing Cork Airport Hotel to provide an…
Cork Airport Hotel , Cork Airport , Lehenaghmore
2342476Cork CityLodged 23 Nov 2023Commercial
- Granted270 m away
Onstruction of 1.8m high screening wall with access gates to the south and east sides of existing yard
GREAT SOUTHERN HOTEL, , GREAT SOUTHERN HOTEL,, CORK AIRPORT,, LEHENAGH MORE,
032371corkLodged 20 May 2003Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Permission for a) the demolition of an existing ancillary storage unit and sub-station, b) the construction…
Clonakilty Enterprise Park, Cloheen, Clonakilty, Co. Cork
20503corkLodged 18 Sept 2020
- GrantedIndustrial
Permission for (a) the demolition of an existing ancillary storage unit and sub-station, (b) the construction…
Clonakilty Enterprise Park, Cloheen, Clonakilty, Co Cork
15659corkLodged 20 Nov 2015
- GrantedCommercial
Permission for development which consists of: THE DEVELOPMENT WILL CONSIST OF the installation of a compact…
Galway Retail park , Headford Road , Co.Galway
2560178Galway CityLodged 20 Jun 2025
- GrantedInfrastructure
Permission for a new prefabricated substation building within the existing car park to cater 4no. electric…
Mahon Point Shopping Centre , Mahon , Cork
2443542Cork CityLodged 20 Dec 2024
- GrantedInfrastructure
10 Year Planning Permission for a physical extension of c. 562 sq.m to the existing electricity substation…
The Existing Cloyne 38kV Substation, Demesne, Cloyne, Co Cork
255257corkLodged 27 Jun 2025
- GrantedRetention
Permission for development which consists of; retention of extensions to the electrical substation and switch…
Merlin Park University Hospital , Merlin Park , Galway
2454Galway CityLodged 8 Nov 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.