Former Hammond Lane Premises, at Spring Lane, Blackpool
Demolition of industrial buildings and construction of 62 apartments in Blackpool.
2341723 · Cork City Council · Lodged 24 January 2023
- Reference
- 2341723
- Authority
- Cork City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 24 January 2023
Summary
AI-generatedThe proposed development involves the demolition of 4 industrial buildings and a two-storey office building. In their place, 3 buildings containing 62 apartments will be constructed, ranging from three to four storeys, along with parking, bicycle facilities, and flood prevention provisions.
- Residential units
- 62
- Storeys
- 4
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for the following proposed development at the former hammond lane premises at spring lane, blackpool, cork: (a) demolition of 4 no. Existing industrial buildings and 1 no. Two-storey office building; (b) removal of concrete slab and weighbridge; (c) construction of a residential development of 3 buildings containing 62 no. Apartments in total (building no. 1, three storeys, 21 no. Units consisting of 10 no. 1-bed apartments and 11 no. 2-bed apartments; building no. 2, four storey, 32 units consisting of 16 no. 2-bed apartments, 16 no. 1-bed apartments; building no. 3, three storey, 9 no. Units consisting of 6 no. 1-bed apartments, 3 no. 2-bed apartments); (d) provision of 16 no. Parking spaces, bicycle parking with separate pedestrian access from spring lane and new vehicular entrance onto spring lane which includes the demolition of portion of the existing road boundary wall, changes to existing boundary treatment and walls; (e) provision of sealant to contaminated soil ; (f) underground storm water attenuation tank to be connected to existing storm sewer on spring lane; (g) allowance for provision of a raised platform for future blackpool flood prevention scheme, as required; (h) connection to existing public services and all associated site works; the development includes proposed new pedestrian crossing, footpath, road markings, traffic calming measures, redesign of junction of spring lane and dublin hill. A road safety audit report is submitted with this application.
Land-use zoning
What this land is zoned for
“To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.”
National zoning type: Existing residential
Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 24 Spring Lane, Blackpool, Cork | Jan 2025 | €190,000 | 33 m |
| 35 Spring Lane, Blackpool, Cork City | Oct 2025 | €135,000 | 72 m |
| 21 Dublin St, Blackpool, Cork | Apr 2025 | €170,000 | 85 m |
| Apt 5 Glen Hall, Thomas Davis St, Blackpool | Nov 2025 | €230,000 | 147 m |
| 9 Lower Dublin Hill, Blackpool, Cork | Mar 2025 | €226,700 | 162 m |
| 78/79 Thomas Davis Street, Cork | Nov 2025 | €1,000,000 | 175 m |
| 6a Lower Dublin Hill, Dublin Hill, Cork | Feb 2026 | €150,000 | 186 m |
| 38 Mount Farran, Assumption Rd, Cork | May 2026 | €310,000 | 244 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received24 January 2023
- Decision due20 March 2023
- Decision issued20 March 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted80 m away
Permission to demolish part wall to rear to already demolished dwelling together with a proposed infill two…
13 Dublin Street , Blackpool , Cork
1938920Cork CityLodged 3 Dec 2019New dwelling
- Granted90 m away
Permission to sub-divide an existing single property to create 2no. individual dwelling units & all other…
7 Dublin Street , Blackpool , Cork
1837729Cork CityLodged 15 Jan 2018Change of use
- Granted120 m away
Permission for construction of a single storey extension to an existing mechanics workshop building, to…
Adjacent to , 32 Dublin Street , Blackpool
2140607Cork CityLodged 29 Oct 2021Retention
- Granted120 m away
Permission is sought for; substantial demolition of existing workshop/garage & existing western boundary wall…
32 Dublin Street , Blackpool , Cork
1636746Cork CityLodged 8 Feb 2016Commercial
- Refused120 m away
Permission for change of use of premises from tool and plant hire use to restaurant with take away facility…
No. 3 , Dublin Street , Blackpool
1737654Cork CityLodged 28 Nov 2017Change of use
- Granted180 m away
Permission for the demolition of existing disused licensed premises building (formerly the fiddlers green…
79 Thomas Davis Street , Blackpool , Cork
1636859Cork CityLodged 27 Apr 2016Apartments
- Granted190 m away
Change of the permitted use from retail to restaurant/café with hours of operation as the shopping centre…
Unit 38 , Blackpool Shopping Centre , Blackpool
1636921Cork CityLodged 15 Jun 2016Change of use
- Awaiting decision190 m away
Permission for a)change of use at ground floor (311 sqm) from Retail to Class 2, b) ATM in existing window…
51/52 Blackpool Shopping Centre , Blackpool , Cork
1737435Cork CityLodged 26 May 2017Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedApartments
Permission for the proposed development which consists of an application for planning permission for the…
Site to the rear of the , former Distillery Bar , Watercourse Road
2543703Cork CityLodged 6 Mar 2025
- Awaiting decisionApartments
Permission for the redevelopment of the site at the corner of Watercourse Road and Bleasby Street Cork City…
Site at the corner of Watercourse Road and Bleasby , Cork City comprising No 3 Bleasby Street , and no 56 and 57 Watercourse Road Blackpool
2241445Cork CityLodged 28 Sept 2022
- RefusedApartments
Permission for the redevelopment of number 86 and part of number 87 Great William O' Brien Street, Blackpool,…
86-87 Great William O' Brien Street , Blackpool , Cork City
2039021Cork CityLodged 3 Jan 2020
- GrantedChange of use
The change of use of the first floor of Unit 7, The Plaza, City Square, Watercourse Road, Blackpool, Cork…
First Floor of Unit 7 The Plaza City Square Wat , Blackpool Co. Cork T23X8PC & the ground and first , 44 Watercourse Road Blackpool
2442889Cork CityLodged 26 Apr 2024
- Awaiting decisionChange of use
Permission for development at 53 Gerald Griffin Street, Blackpool, Cork, T23V623. The proposed development…
53 Gerald Griffin Street , Blackpool , Cork
2544194Cork CityLodged 25 Sept 2025
- GrantedChange of use
Permission for change of use of their premises at 37/38 Thomas Davis Street, Blackpool, Cork from retail to…
37/38 Thomas Davis Street , Blackpool , Cork
1938942Cork CityLodged 9 Dec 2019
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.