Planning Permission Ireland
GrantedIndustrialDecided 19 February 2024

Boston Scientific Ireland Ltd., Cork Business & Technology Park, Model Farn Road

Demolition of structures and construction of a utilities building extension at Boston Scientific, within a protected estate.

2342546 · Cork City Council · Lodged 15 December 2023

Reference
2342546
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
15 December 2023

Summary

AI-generated

The development consists of the demolition of a waste canopy, fencing, and a pipe bridge, followed by the construction of a single-storey Utilities Building extension. The site is located within the curtilage of the Protected Structure 'Former Munster Institute'.

Industrialmedtechprotected structuredemolition
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the demolition of an existing waste collection canopy, screening wall fencing, a pipe bridge and a small section of the loading bay retaining wall and steps, together with the construction of a single-storey utilities building extension, comprising a separate chilled water plant room and electrical switch room, with rooftop platform and equipment (housed behind an acoustic parapet wall), a rooftop access bridge, a roof access ladder and associated site works, at the existing facility at boston scientific ireland ltd. , cork business and technology park, model farm road, cork, t12yk88. The development is within the curtilage of a protected structure ps637 'former munster institute'.

Land-use zoning

What this land is zoned for

Business and TechnologyCOE
To provide for the creation and protection of high technology related office-based industry and enterprise, to facilitate opportunities for employment creation.

National zoning type: Office, business/technology park and related

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 Parkway Dr, Model Farm Rd, CorkOct 2025€390,000213 m
5 Melbourne Court, Model Farm Rd, CorkJun 2026€335,000313 m
17 Melbourne Court, Model Farm Rd, CorkDec 2025€320,000317 m
11 Melbourne Court, Model Farm Rd, CorkMar 2025€385,000334 m
Apt 107, Parchment Sq, Model Farm RdDec 2025€285,000409 m
34 Leesdale, Parkway Dr Model Farm Rd, CorkAug 2025€305,000412 m
17 Kenley Close, Model Farm Rd, CorkMay 2026€625,000440 m
21 Parchment Sq, Model Farm Rd, CorkFeb 2026€286,000446 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 December 2023
  2. Decision due19 February 2024
  3. Decision issued19 February 2024
  4. Grant issued2 April 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.