Planning Permission Ireland
GrantedIndustrialDecided 25 February 2025

Boston Scientific Ireland Ltd, Cork Business and, Technology Park

Modifications and extensions to the Boston Scientific manufacturing building within the curtilage of a protected structure.

2442971 · Cork City Council · Lodged 29 May 2024

Reference
2442971
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
29 May 2024

Summary

AI-generated

The proposed development consists of extensions and internal modifications to the existing manufacturing building to create additional floor area at ground and mezzanine levels. Site works include a new pallet shed, sprinkler pump house, fire water tanks, waste yard, chemical store, and bike store. The site is located within the curtilage of the Former Munster Institute, a protected structure.

Industrialindustrialextensionprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for modifications to the existing manufacturing building and all ancillary site development works at the cork business and technology park, model farm road, cork, t12dh66. The proposed development consists of modifications to the existing building that include: (1) the construction of an extension to the building with roof access stairs, (2) internal modifications to the layout resulting in the creation of additional floor area at 5 corners of the building at ground and mezzanine levels, (3) an extension of the mezzanine level, (4) the installation of roof lights; (5) roof access stairs to the existing roof; (6) new loading bay; and (7) new external doors at ground floor level. The proposed site development works include the construction of: a) a pallet shed; (b) a sprinkler pump house; (c) 2 no. Fire water tanks; (d) a new waste yard; (e) a chemical store; (f) removal and replacement of two existing retaining walls; (g) perimeter fencing; (h) a bike store. The site is within the curtilage of a protected structure, the former munster institute (ps637).

Land-use zoning

What this land is zoned for

Business and TechnologyCOE
To provide for the creation and protection of high technology related office-based industry and enterprise, to facilitate opportunities for employment creation.

National zoning type: Office, business/technology park and related

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 Parkway Dr, Model Farm Rd, CorkOct 2025€390,000174 m
11 Kenley Close, Model Farm Road, Cork CityApr 2026€300,000361 m
17 Kenley Close, Model Farm Rd, CorkMay 2026€625,000364 m
13 Kenley Drive, Model Farm Road, CorkJan 2025€752,000384 m
34 Leesdale, Parkway Dr Model Farm Rd, CorkAug 2025€305,000401 m
72 Leesdale, Model Farm Road, CorkSept 2025€396,000475 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 May 2024
  2. Decision due25 February 2025
  3. Decision issued25 February 2025
  4. Grant issued7 April 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.