Planning Permission Ireland
RefusedChange of useDecided 16 July 2025

Former Permanent TSB Premises, No. 1 Curraheen Road, Townland of Ballinaspig More

Conversion of a former bank building into a funeral home in Bishopstown.

2543904 · Cork City Council · Lodged 22 May 2025

Reference
2543904
Authority
Cork City Council
Register status
Appealed
Type
PERMISSION
Received
22 May 2025

Summary

AI-generated

The project involves changing the use of a former Permanent TSB bank building to a funeral home. The works include partial demolition of the mezzanine floor, internal walls, and a single-storey extension.

Change of usebank conversionfuneral homechange of use
Floor area
382 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development at a site of approximately 0.29 ha located at the former permanent tsb premises, no. 1 curraheen road, townland of ballinaspig more, bishopstown, cork city, t12 rk60. The development consists of the repurposing of the redundant former financial services building by: change of use of existing building (totalling 382 sq m gross floor space) from financial services to funeral home and associated funeral services. Construction works at the funeral home and associated funeral services building comprising the partial demolition (51 sq m) of existing mezzanine first floor and associated internal walls and partitions (incl. Store areas, staff rooms, circulation and toilets); demolition at ground floor of the internal walls and partitions (incl. Safe room, lobby and entrance areas, atm and electrical rooms, offices, staircase, staff and bank floor areas); and demolition at ground floor of single storey height building extension (14 sq m) along northern elevation (boiler, toilet and toilet lobby areas). Construction works at the funeral home and associated funeral services building comprising the construction at ground floor of a single storey height building extension (41 sq m) along northern elevation and a single storey height building extension (3 sq m) along eastern elevation; construction at ground floor (totalling 293 sq m) with internal walls and partitions to facilitate/accommodate 2 no. Reposing areas, toilets, entrance/exit lobby areas, stairs lobby, office and family room, storage and services areas; construction (73 sq m) to form a new mezzanine first floor (totalling 141 sq m) with internal walls and partitions to facilitate/accommodate a meeting and staff rooms, plant/comms rooms, store and mezzanine/gallery areas. The following additional elevational changes are proposed: new primary building entrance/exit arrangements, rooftop photovoltaic solar panel array, revised glazing at first floor height and louvre ventilation extraction, all on the western elevation; revised glazing at first floor height and louvre ventilation extraction on the northern elevation; external canopy (40 sq m) along the western and northern elevations; revised secondary building entrance/exit arrangements, revised glazing at first floor height, remove existing clock and replace with louvre ventilation extraction, removal of night deposit safe and atm and new rooftop photovoltaic solar panel array, all on the southern elevation; and rooftop photovolta

Land-use zoning

What this land is zoned for

Neighbourhood and Local CentresDC
To protect, provide for or improve local facilities.

National zoning type: District, neighbourhood centre

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Floraviolle, Bishopstown Road, County CorkDec 2025€290,00098 m
Roselea, Bishopstown, CorkJun 2026€317,500110 m
15 Merlyn Lawn, Bishopstown, CorkJul 2025€670,000112 m
Glenholme, Bishopstown Rd, CorkJan 2026€252,000132 m
29 Firgrove Gardens, Bishopstown, CorkFeb 2025€475,000154 m
23 The Cornfields, Bishopstown, CorkDec 2025€345,000170 m
45 Central Ave, Bishopstown, Corknot full market priceJun 2025€112,000199 m
37 Woodbrook Rd, Bishopstown, CorkSept 2025€776,000253 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 May 2025
  2. Decision due16 July 2025
  3. Decision issued16 July 2025
  4. Appeal submitted11 August 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.