Planning Permission Ireland
Awaiting decisionChange of use

48 Grand Parade, Cork

Change of use of the ground and first floors of a protected structure from offices to three apartments.

2544152 · Cork City Council · Lodged 11 September 2025

Reference
2544152
Authority
Cork City Council
Register status
In progress
Type
PERMISSION
Received
11 September 2025

Summary

AI-generated

The application seeks to convert the ground and first floors of a protected structure from office use to residential use, creating two studio apartments and one single-bedroom apartment. Works include replacing PVC windows and doors with timber alternatives and removing internal partitions.

Change of useprotected structureapartmentsconversion
Residential units
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission to change the use of the ground and first floors of 48 grand parade, cork, (a protected structure-rps 118), from office use to residential use, (ie. 2 no studio and 1 no. One bed apartments). Permission is also sought to replace a tilt and turn pvc window on the upper level, with timber sliding sash window and a pvc door to the rear roof terrace to be replaced with timber door with vision panel, together with all ancillary site works including the removal of a number of internal partitions, and all associated site development works.

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 1, 30 South Main St., CorkSept 2025€700,000104 m
Apt 1 The Flying Enterprise Complex, South Gate Bridge, Cork CityNov 2025€1,100,000118 m
13 St Nicholas Church Place, Cove St, CorkJul 2025€386,000137 m
1 Drinan Street, CorkApr 2026€380,000145 m
2 Nicholas Place Apts, 14 Travers St, CorkJan 2025€225,000174 m
Apt 1, 2 Sullivans Quay, CorkMar 2026€261,000180 m
Apartment 2, 14 South Main Street, CorkMay 2025€153,333183 m
Apartment 3, 14 South Main Street, CorkMay 2025€153,333183 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.