MEENADREEN, STRANESS, CO. DONEGAL
Development of a modular battery energy storage system facility with 27 battery modules near an existing wind farm.
1951446 · Donegal County Council · Lodged 23 September 2019
- Reference
- 1951446
- Authority
- Donegal County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 23 September 2019
Summary
AI-generatedThe application seeks a 10-year permission for a modular battery energy storage system (BESS) facility. It will consist of up to 27 battery storage modules, transformers, power conditioning units, switchgear, a substation container, and an internal access road connecting to the Meenadreen Wind Farm network.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development of a modular battery energy storage system (bess) facility for a period of 10 years consisting of up to 27 no. Battery storage modules (up to 14m length, 2.44m wide and 2.9m high) and ancillary equipment including up to 27 no. Transformers (up to 2.5m length, 2.5m wide and 2.9m high), 27 no. Power conditioning unit block areas (up to 8.0m length, 1.5m wide and 2.3m high), 27 no. Switchgear units (up to 1.5m length, 1.5m wide and 2.2m high), substation container (up to 4.5m length, 4.5m wide and 3.0m high); internal permeable access road joining the facility with the existing meenadreen wind farm road network and all other associated site development works, including fencing, drainage and underground electrical connections, required to facilitate the development and use of existing access arrangements. A natura impact statement accompanies this application
Key dates
Timeline
- Application received23 September 2019
- Further information requested14 November 2019
- Further information received10 February 2020
- Decision due5 April 2020
- Decision issued2 April 2020
- Grant issued26 June 2020
- Permission expiry25 June 2030
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted100 m away
CONSTRUCTION OF A c.562 sq.m. OPERATIONS BUILDING OVER 3 FLOORS INCORPORATING A RECEPTION AREA, WORKSHOP,…
STRANESS Td , TULLYNAUGHT , CO. DONEGAL
1650759DonegalLodged 27 May 2016Commercial
- Awaiting decision110 m away
CONSTRUCTION OF A C.562 SQ.M OPERATIONS BUILDING OVER 3 FLOORS INCORPORATING A RECEPTION AREA, WORKSHOP,…
STRANESS TD , TULLYNAUGHT , DONEGAL PO
1650719DonegalLodged 23 May 2016Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
FOR A 10 YEAR PERMISSION TO CONSTRUCT A BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY ON A TOTAL SITE AREA OF…
KILPADDOGE , TARBERT , CO. KERRY
18878KerryLodged 10 Sept 2018
- GrantedEnergy
A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY WITHIN THE FOOTPRINT OF A PREVIOUSLY CONSENTED…
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047)
2152OffalyLodged 9 Feb 2021
- Awaiting decisionEnergy
THE CONTINUED USE OF A CONSENTED CONSTRUCTION COMPOUND (PL19.PA0047) AS A MODULAR BATTERY ENERGY STORAGE…
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047)
217OffalyLodged 12 Jan 2021
- Awaiting decisionEnergy
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN A…
N13 LISTILLION , LETTERKENNY , CO. DONEGAL
2660468DonegalLodged 23 Mar 2026
- RefusedEnergy
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN…
N13 LISTILLION , LETTERKENNY , CO. DONEGAL
2660548DonegalLodged 2 Apr 2026
- GrantedEnergy
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED…
SHRONEBEIRNE , LISTOWEL , CO KERRY
23574KerryLodged 18 May 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.