CONVERSION OF ATTACHED GARAGE TO BEDROOM, CHANGES TO ALL HOUSE ELEVATIONS AND ALL ASSOCIATED SITE DEVELOPMENT…
2561771DonegalLodged 10 Oct 2025100 m away
Construction of a 228-unit residential development with retail units, a creche, and a new link road.
2661462 · Donegal County Council · Lodged 5 August 2026
This Large-Scale Residential Development (LRD) application proposes 228 residential units, comprising 71 houses and 157 apartments. The development also includes four retail units, a pre-school creche, and a new access link road connecting existing housing estates.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
A period of 10 years for a large-scale residential development (lrd) consisting of the following: (1) construction of 228 no. Residential units consisting of (a) 71 no. Houses, housing mix of 65 x 3 bedroom houses & 6 x 4 bedroom houses and (b) 157 no. Apartments, apartment mix of 122 x 2 bedroom apartments & 35 x 1-bedroom apartments, (2) construction of local retail and service uses: 476m² (5,123sq/ft) with 4 no. Individual units, (3) construction of a pre-school (creche) with outdoor classroom/play area: 160m² (1722sq/ft), (4) an access link road connecting into the existing public road network (l-20854-0) via the existing housing estate at abbey view to the southwest of the site and extending eastwards to connect to the existing road network at existing housing estate at winward drive to the east of the site, with creation of new road for future separate connection to the south-west of the site, (5) all associated footpaths and cycle lanes & internal pedestrian linkage paths, (6) vehicular & footpath link to the lands to the north of the site, (7) parallel parking spaces along the new link road and associated parking throughout the site, (8) amenity & green spaces throughout the site consisting of hard and soft landscaping, (9) biodiversity zones throughout the site with native trees, shrubs & pollinator planting, (10) a dedicated natural woodland park & green amenity space to the south of the site, (11) retention and protection of the existing deciduous woodlands to the north-east of the site, (12) a foul sewer connection to the adjoining public foul sewer network, (13) storm water drainage and connection to adjoining public storm water network, (14) suds storm retention drainage systems as required, (15) provision for a new water connection to the development from the adjoining public water main, (16) public lighting throughout the development site, (17) electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site, (18) provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities as required throughout, (19) controlled & uncontrolled pedestrian crossings throughout the site. (20) site excavation works to facilitate the proposed development to include exxcavation and general site preparation works and any retaining structures that may be required throughout the site, (21) ancillary site development/construction works to facili
The historical record
85% granted
of 271 housing estates granted, refused or part-granted by Donegal County Council, 2016–2026.
These are historical figures for this category in this council area, counted from the statutory register over the last 10 years. They are not an assessment of this application and say nothing about how it will be decided.
Construction & sales
Beyond the decision: whether construction was notified to start here, whether a completion certificate followed, and what property here has sold for.
| Address | Date | Price | Distance |
|---|---|---|---|
| 7 Glebe Crest, Donegal, Donegal | May 2026 | €355,000 | 106 m |
| 2 Glebe Court, Donegal Town, Co Donegal | Dec 2025 | €176,000 | 211 m |
| 27 The Glebe, Donegal Town, Donegal | Dec 2025 | €245,000 | 271 m |
| 20 Sli Na Mbroc, Winward Dr, Donegal Town | Jun 2026 | €276,500 | 369 m |
| 16 Sli Na Mbroc, Ardeskin, Donegal Townprice excludes VAT | Apr 2025 | €240,000 | 390 m |
| 15 Sli Na Mbroc, Donegal Town, Donegalprice excludes VAT | Feb 2025 | €255,000 | 404 m |
| 9 Sli Na Mbroc, Ardeskin, Donegal Townprice excludes VAT | Apr 2025 | €250,000 | 436 m |
| Main Street, Donegal Town, Co Donegal | May 2025 | €130,000 | 439 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
In the area
Other planning applications within about 500 m — what else is being proposed or built nearby.
CONVERSION OF ATTACHED GARAGE TO BEDROOM, CHANGES TO ALL HOUSE ELEVATIONS AND ALL ASSOCIATED SITE DEVELOPMENT…
2561771DonegalLodged 10 Oct 2025100 m away
CONSTRUCTION OF A STOREY AND A HALF TYPE DWELLING HOUSE, DOMESTIC GARAGE AND ALL SITE WORKS ASSOCIATED WITH…
1850280DonegalLodged 27 Feb 2018150 m away
EXTENSION TO EXISTING BEDROOM TO FRONT OF DWELLING HOUSE, CONSTRUCTION OF A NEW PITCHED ROOF OVER, NEW…
1651261DonegalLodged 26 Aug 2016160 m away
DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
2151295DonegalLodged 30 Jun 2021170 m away
2 NO. DORMER WINDOWS AT FIRST FLOOR LEVEL (2) ALTERATIONS TO THE FACADES OF THE HOUSE (3) CONVERSION OF…
1751275DonegalLodged 15 Aug 2017210 m away
DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE
2350983DonegalLodged 6 Jul 2023250 m away
CONSTRUCTION OF A SPLIT-LEVEL DWELLING HOUSE, PART SINGLE-STOREY & PART DORMER, WITH CONNECTION TO THE PUBLIC…
2050870DonegalLodged 3 Jul 2020260 m away
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO MAIN PUBLIC FOUL SEWER
1951801DonegalLodged 20 Nov 2019270 m away
Related developments
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
A PERIOD OF 10 YEARS FOR A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD) CONSISTING OF THE PROVISION OF A TOTAL…
2661208DonegalLodged 30 Jun 2026
CONSTRUCTION OF 56 RESIDENTIAL UNITS CONSISTING OF (A) 26 NO. THREE-BEDROOM TWO-STOREY SEMI DETACHED…
1951971DonegalLodged 20 Dec 2019
10-Year for a Large-Scale Residential Development (LRD) of 243 no. dwellings and 1 no. childcare facility…
2560566WaterfordLodged 18 Aug 2025
10 YEAR DURATION FOR CONSTRUCTION OF (1) 14 NO. TWO AND A HALF STOREY FOUR-BEDROOM SEMI-DETACHED DWELLINGS;…
1951897DonegalLodged 6 Dec 2019
CONSTRUCTION OF A RESIDENTIAL HOUSING DEVELOPMENT COMPRISING 12 NO. NEW HOUSES, RANGING IN HEIGHT FROM…
2350359DonegalLodged 21 Mar 2023
CONSTRUCTION OF (1) 14 NUMBER TWO AND A HALF STOREY FOUR-BEDROOM SEMI-DETACHED DWELLINGS; 40 NUMBER TWO…
1951733DonegalLodged 8 Nov 2019
Community
What local people think about this application.
Nobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.